杭州湾工程特色(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
杭州湾工程特色(国外英文资料)

杭州湾工程特点(国外英文资料) Features of the project 1, engineering environment features, Hangzhou Bay weather is complex and changeable, typhoons, tornadoes, thunderstorms and sudden small range of disastrous weather have occurred. The natural conditions of Hangzhou Bay has the following characteristics: (1) the waters wide, typhoon, large tidal range and velocity is urgent, which is characteristic of the climate typical, effective working days less; (2) soft soil thickness, the bearing layer is deep, brought a series of problems in the design and construction of offshore foundation; (3) south beach a long, complicated construction conditions, the conventional design and construction method is difficult to meet the project requirements; (4) the serious corrosion environment; (5) South Beach in multiple areas of shallow gas accumulation, endangering the construction safety. 2, construction difficulties (1) project scale, large volume of marine engineering. The length of the bridge is 36 kilometers, and the length of the sea is 32 kilometers. Full bridge a total of 2 million 450 thousand cubic meters of concrete, 820 thousand tons of various types of steel pipe pile, bored piles 5513, 3550, 1272 pile caps, pier 1428, the vast scale of the works. (2) the natural environment is abominable. The flow velocity range is large and urgent, chaos, wave height, scour depth, thick soft ground, the shallow part of the section of gas enrichment. Among them, the south bank 10 kilometers beach area dry and wet alternate, marine engineering mostly for far shore operation, construction condition is very poor. Under the influence of hydrology and meteorology, the effective working days are few. According to field construction statistics, the annual effective days of marine construction work are less than 180 days, and the tidal flat area is about 250 days. (3) it is very difficult to formulate the overall design plan. The new design requirements, the district water bridge (18.27 km) bridge and So

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档