某公路大桥主梁合拢段施工方案(国外英文资料).docVIP

某公路大桥主梁合拢段施工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
某公路大桥主梁合拢段施工方案(国外英文资料)

某公路大桥主梁合拢段施工方案(国外英文资料) Construction scheme of main girder closure section of a highway bridge 1. General situation of Engineering The main span of the main girder is 2m, each section of concrete is 34.4m3, and the weight of concrete is about 86t. Full bridge joint Set closure section 2 road. 2. Preparation before closure The hanging basket construction after the completion of the hanging basket back section of a beam anchored in the beam, the bridge deck is not clear After the necessary load, the construction of the closure section. The closure section construction is an important link of the main girder construction, Before construction, firstly, the elevation and the deflection of the hanging end of the hanging basket are measured, and the measurement results are given For analysis, if the error requirements of the original design are exceeded, the cause of the problem shall be found and the root of the problem shall be determined It is requested that adjustments be made. The main girder closure section adopts basket cast-in-place construction. 3, construction personnel, machinery and tools During the construction of the closure section, the construction tools mainly include manual jack, water pump, vibrating bar, cloth pole and so on. Construction staff of about 70 people. The pouring into the concrete pump 3, 1 spare, with two pumps from both sides of the mix Condensate; 60 and 50 mixing station each one; tank car 3; 40 loader 1; 16T crane 1, Vibration bar 16 (50mm vibration bar 10, 30mm vibration bar 6), water pump 6. Scraping the lever 2, Mud board 10. 4. Construction personnel organization slightly 5, construction sequence CB25 and SB11 segment pouring to CB25, hanging basket back to CB24, SB11 segment hanging basket back to SB10 to install the basket to girder weight, remove of temporary pier, welding skeleton, demolition of temporary Bianta Restrain lashing steel bar, pouring concrete, stretching and folding beam, removing temporary beam, removing hanging b

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档