造价知识点(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价知识点(国外英文资料)

造价知识点(国外英文资料) Highway construction procedure: 1. project proposal 2. feasibility study report 3. preliminary design 4. construction drawing design 5. construction preparation 6. organization construction 7. completion acceptance The difference between the total investment estimate and the preliminary design estimate of the project feasibility study shall be within 10% The basic units of highway construction are construction units, survey and design units, construction units, supervision units, engineering quality supervision units and construction banks. The engineering design is divided into three types: one stage design, two stage design and three stage design. Highway engineering construction generally adopts two stages design, namely preliminary design and construction drawing design. One stage construction drawing design, the three stage design, namely preliminary design, technical design and construction drawing design. Construction cost: the total cost of building a project and bringing it to the design requirements. Valuation features of construction cost: 1. single character, more than 2. times valuation The composition of highway construction cost: Construction and installation costs, equipment, equipment purchase costs, other construction costs, reserve fees Estimate -- project proposal, feasibility study report Preliminary estimate: preliminary design Budget -- construction drawing design Settlement - during construction Final accounts completion Funds for capital construction projects: 1.. Budget 2.; self financing 3. bank loans; 4. foreign capital 5. securities Norm: the amount of work, materials and machines needed to complete a qualified product under normal construction conditions. The characteristics of quota are scientific, systematic, unified, legal and relatively stable Artificial 8h, miners, 7h, scuba, 6h transformers and distribution facilities 24h Construction quota: construction team under normal construction conditions, the completion of q

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档