项目施工员岗位职责(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目施工员岗位职责(国外英文资料)

项目施工员岗位职责(国外英文资料) Job responsibilities of Project Engineer 1, responsible for the construction of the overall deployment, site layout. 2, coordinate the construction progress, quality and safety of the service layer. Implement the general construction plan. 3, assessment and evaluation of labor services. 4, supervise the service level according to standard construction, ensure safe production and civilized construction. Comprehensive, reasonable and effective implementation of the program to keep the construction site safe and effective. 5. Propose measures to ensure construction safety and quality and organize the implementation. 6, supervise the construction materials and equipment on time, and in good condition, to ensure the smooth progress of the project. 7, to participate in the completion of the project delivery, responsible for the integrity of the project protection. 8. Record the construction log on time and accurately. 9, reasonable allocation of factors of production, strict organization of construction, ensure the progress and quality of the project. 10. Organize the acceptance of concealed projects and participate in the quality evaluation of sub projects. 11, to participate in the preparation of drawings and project schedule. Project Engineer Responsibilities I. implementing the rules and regulations on quality management at the higher level, and implementing the technical documents and technical requirements raised by the technical personnel in the project management organization. Two, learn to be familiar with the drawings (in drawings necessary), responsible for the team and ensure technical disclosure, according to the drawings. Three, to participate in the preparation of general engineering construction organization design, and earnestly implement the approved construction organization design. Four, responsible for measurement, sample. Five. Check the quality of new materials, semi-finished products and products, and prepare the materials and sam

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档