- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文-碾压混凝土坝RCC讲稿
RCC as a New Construction Method
(RCC作为一种新的施工方法)
8.1 General Construction Considerations (一般情况下施工过程需考虑的因素)
·There are considerable differences between vertical, block-by-block construction (垂直块状浇筑)of dams with conventional mass concrete and horizontal, lift-by-lift construction(水平通仓浇筑)of dams with RCC.
· The construction plant for RCC is usually, less costly, and utilized at a higher capacity factor (利用率)than that required for conventional concrete gravity dams.
·But the fast pace of placement required to achieve the economies possible with RCC imposes a greater discipline (要求)on the planning, scheduling(进度), and coordination(协调) in the field between designer(设计) and contractor(承包商).
·The RCC design approaches described in Chaps. 4, 5, and 6 diverge(不同点在于….) in some construction procedures.
· In all cases, however, the mixing(拌合), transporting(运输), spreading(摊铺), and compacting (碾压)of relatively large volumes of material are concentrated into a short time interval. In the United States, the time limit from mixing plant to final compaction is about 45 min. It is about twice that in Japan. In addition, the Japanese RCD method requires that lifts be cured (养护)for as long as 36 h before placement (浇筑)of the next layer of RCC. In the United states and elsewhere, the goal has nearly always been to come as close as possible to continuous placement of RCC.
8.1.1 Scheduling
Construction scheduling for RCC is less forgiving than for mass concrete(大体积混凝土). Although some mix designs can have greater tolerances than conventional concrete, RCC is still a sensitive concrete and the critical path (关键路线)for placing RCC is focused on completing one lift at a time. There are no alternate monolithic (整块的、独块的)blocks to form or place while problems are being analyzed.
To avoid costly delays over disputes on specification(规范)compliance(执行), the authority to resolve engineering problems must be vested in a well trained field organization. Lines of communication between the project engin
您可能关注的文档
最近下载
- 2025秋统编版(2024)小学道德与法治三年级上册(全册)课时练习及答案(附目录).docx
- (2025秋新版)人教版三年级数学上册《观察物体》PPT课件.pptx VIP
- (鲁班奖)网架专家论证汇报资料.ppt VIP
- 行业资料 - 国家储备林改培技术规程-国家林业局.pdf VIP
- Q960E高强度调质钢焊接工艺研究.pdf VIP
- 2025-2026学年第一学期数学教研组工作计划.doc VIP
- ISO15378-2017药包材对ISO9001的应用.pptx VIP
- 13.1三角形的概念 课件(共24张PPT) 人教版(2025)数学八年级上册(含音频+视频).pptx VIP
- 2025级中职语文教学工作计划5篇.pdf VIP
- 第十章 商品的品名品质数量和包装.ppt VIP
文档评论(0)