- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
企业回报方案
就像“感动中国年度人物”那样划破长空
如同“全国道德模范”那样震撼心灵
踏着“寻找最美乡村教师”的足迹
循着“寻找最美乡村医生”的心路
“寻找中原最美孝子”又一次出发……
你我用心发现 寻找中原最美孝子
2013河南电视台
“寻找中原最美孝子”大型公益活动
企 业 回 报 方 案
河南电视台
2013年3月
2013河南电视台“寻找中原最美孝子”大型公益活动
企业回报方案
一、活动概述
为了贯彻落实党的十八大报告出弘扬中华社会认同性、提供强有力的思想道德保障你我用心,最美
manufacturers of technical documents on the quality requirements applicable to this project. Construction quality inspection and evaluation standards issued by the national power company of the electric power construction standard for quality inspection and assessment of the 11 articles assessment inspection standards as well as other relevant regulations issued by the Ministry of electric power, the State power company executive. Does not verify in the specification within the evaluation criteria, implementation design, manufacturer or ... Or issue a new national standards and regulations, bidders shall comply with new norms and standards. If there are conflicts or is inconsistent, whichever is the higher standards. 3.3 3.3.1 project of responsibility, authority and communication organization and project managers, at all levels of responsibility and authority see section II of chapter III of the present tender site management organization and part of workforce planning. 3.3.2 according ISO 9001, GB/T 50430 and company quality distribution of the quality manual, combining the departments of projects, project quality function distribution allocation table on the following page of the projects quality functions shown below. 3.3.3 project with each Department interface, interface between the internal departments of the project by project managers at all levels and the quality regulations of the responsibilities and authorities of the Department. Customer requirements and hope: project management; Quality planning, management program: the projects quality control Department; Site design: Project Engineering Department; Contract: the contract budget
manufacturers of technical documents on the quality requirements applicable to this pro
您可能关注的文档
最近下载
- 20171017_宁波新世界明楼项目汇报文件.pptx VIP
- (人教PEP版2024)英语五年级上册 Unit2 大单元教学设计.docx VIP
- 劳务合同模板2025.docx VIP
- 高性能探针卡生产线项目规划设计方案.docx
- 2024年秋新沪科版物理八年级上册 第五章大单元整体设计 教学课件.pptx VIP
- 数字赋能乡村治理的实践探索与优化路径——以晋南S村为例.pdf
- 《道路运输管理实务》第2版综合测试题.docx VIP
- 《人工智能导论》课件.ppt VIP
- 第一章 大学生心理健康教育.pdf VIP
- 《铁路线路养护与维修》课件全套 模块1、2 基础知识;普速铁路线路工务作业.pptx
文档评论(0)