- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
信号类1(国外英文)
信号类1(国外英文资料)
Fill in the blanks (fill the blanks with the correct answers)
1. Automatic block system, automatic block and block (semi-automatic block) are adopted in the basic block method.
2 when using the semi-automatic block method, the train will enter the interval by the signal displayed by the station signal or by the signal through the line.
3 when the station is interrupted by all telephones, the single track bus shall be written in accordance with the law of communication, and the two lane traffic shall be pressed (time interval method).
4, to block the construction of the road to open the road when the train, the train into the blockade area of driving documents for (dispatch order).
5 and four show the automatic block section, a green light and a yellow light --- allowing the train to proceed from the station, indicating the presence of (2) blocked partitions ahead of the station.
6 、 the signals of the station, the station, the route signal and the signal station are all positioned by the signal (stop signal).
7 (stop signal) when the lights of the station, the exit, the route and the signal pass out, show unknown or show incorrect.
8. The operation shall be located at both ends (500-1000) m of the construction line and its adjacent line from the construction site.
9 、 the deceleration spot is located at each (20) m of the two ends that need to be decelerated.
10, rail car even after hanging, first (test pull), to promote the speed of operation shall not exceed 20km/h, can not cross the interval operation.
11, rail car repair (divided into minor repairs, repair, overhaul and repair process) 3.
12, the signal device is generally divided into signal and (signal indicator) two categories.
13, stop, and through the shutoff signal under the condition of normal display distance not less than m (1000).
14, to accurately grasp the shunting operation speed, traction line when running in no more than (40) km/h.
15, the shunting operation to accurately grasp the s
您可能关注的文档
最近下载
- 2025中国能建电规总院招聘(北京)笔试备考题库及答案解析.docx VIP
- 年产200吨聚烯烃催化剂技改项目环评报告书.pdf
- 上海浦东新区中小学教师考试题目汇总2024.docx VIP
- 血细胞形态识别培训课件终版.ppt VIP
- (一模)吉林市2025-2026学年度高三第一次调研测试 英语试卷(含答案解析).docx
- 《汽车维修质量检验》电子教案.pdf
- 工程勘测设计行业质量管理体系专业审核作业指导书.PDF VIP
- 2.2开通抖音直播《直播营销》教学课件.pptx VIP
- 综合实践进位制的认识与探究课件人教版七年级数学上册(1).pptx
- 千字文精选:阿尔巴尼亚电影全记录.doc VIP
原创力文档


文档评论(0)