厂址原则(国外英文).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
厂址原则(国外英文)

厂址原则(国外英文资料) The concept of overall planning of industrial enterprises is a general arrangement and planning of all parts of the enterprise and its related facilities. It is an important stage in the design and construction of enterprises, and is one of the contents of the general layout design. Enterprise planning task is: according to the construction requirements of the task, determine the plant area, residential area, waste dump position; to determine the internal and external mode of transport, rational organization of people and logistics; reasonable planning and practical construction land, with the relationship between production and comprehensive utilization of waste land and basic farmland, good industrial processing. Enterprise overall planning steps: 1. on the map, in the already determined site, the layout of the main production facilities, to determine the general layout of the layout, in order to determine the shape of the plant site, land use and so on. 2. according to the business volume, site area transportation conditions, determine the main contents of internal and external mode of transport and planning by the railway station to the railway line, factory station location and form in railway system. After 3 in the plant location and external transport facilities, sewage emissions according to the known power supply, water supply, planning, layout of high-voltage line direction, path and high-voltage wire corridor, determine the supply and drainage pipe path. 4. Determine the location of the scrap yard, the mode of transportation and the route used. 5. according to the enterprise quota and country volume coefficient, land use standards, calculation of residential land and to determine the number and location of settlements. 6. determine the location and scope of the construction site. 7., planning and layout of comprehensive utilization facilities. 8. planning and layout of the necessary protective belt, green belts and off-site nursery land. Ind

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档