- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年一级建造师市政公用工程真题及答案(国外英文资料)
2010年一级建造师市政公用工程真题及答案
2010 annual national construction division qualification examination papers
Management and practice of municipal public works
First, individual choice questions
1. road inorganic binder stabilized base, two ash stabilized soil () higher than lime soil.
A. plate plasticity
B. early strength
C. frost resistance
D. dry shrinkage
[answer] C
2. the bearing layer in the pavement structure is ().
A. base
B. top floor
C. bottom layer
D. cushion
[answer] A
3. after the construction of the ordinary concrete pavement has been completed and maintained, the pedestrian is allowed to pass after the concrete reaches 40% of the design strength.
A. compression
B. bending
C. tensile
D. shear
[answer] B
4. the maximum earth pressure of rigid retaining wall interaction with soil is () earth pressure.
A. stationary
B. passive
C. equilibrium
D. initiative
[answer] B
5. when the precast pile is sunk, the hammering process shall be adopted.
A. heavy hammer high impact
B. heavy hammer low strike
C. light hammer, high impact
D. light hammer, low impact
[answer] B
6. when the design of prestressed concrete continuous beam with C50 strength, the minimum strength of concrete should reach () MPa.
A.35.0
B.37.5
C.40.0
D.45.0
[answer] B
7. when the tension of the post tensioned prestressing tendon is tensioned, the strength of the grout used in the grouting of the duct shall not be less than () MPa when the design is not required.
A.15
B.20
C.30
D.35
[answer] C
8. the construction method should be adopted when constructing multi layer and multi span structure tunnel with shotcrete anchor method.
A. full section method
B. step method
C. side drift method
D. column hole method
[answer] D
9. in the compensator of the following heating pipes, the natural compensation method is ().
A. waveform compensator
B.Z compensator
C. square compensator
D. filling compensator
[answer] B
10. a gas transmission and distribution system consisting of low pressure and medium pressure B (medium pre
您可能关注的文档
- !!!变压器的要求和技术参数(国外英文资料).doc
- (上卷)重新学会笑--------中国式新森田教...(国外英文资料).doc
- (宁鸣)晨间(国外英文资料).doc
- (四)津液-(国外英文资料).doc
- (新版)高强轻质高温耐火砖生产制造制备及应用工艺专利技术文集(国外英文资料).doc
- (图解)普林斯顿进攻体系(国外英文资料).doc
- (第1章) 单片机教案(国外英文资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英文资料).doc
- - 上海LNG加气站 上海CNG加气站博客上海LNG加气站 上海CNG加气站博客(国外英文资料).doc
- ...我相信能耐耐心心看完文章的人,不用再对手机这东西纠结了_百度文库...(国外英文资料).doc
最近下载
- 工学一体化课程《小型网络管理与维护》任务4单元4教学单元活动方案.docx VIP
- 铜矿开采施工人员培训方案.docx
- 配电架空线路通道内树木砍伐修剪施工方案.docx VIP
- 中文网络成瘾量表修订版(CIASR).docx VIP
- 如何正确上颌架?.pptx VIP
- 《燕尾型配合工件说》课件.pptx VIP
- ISO 4210-8-2023中文+英文-自行车–自行车的安全要求-第8部分.pdf
- 超星尔雅学习通《中华民族共同体概论(云南大学)》章节测试答案.docx VIP
- T∕ZZB 1228-2019 强制式简易升降机.pdf VIP
- (正式版)S-H-T 3551-2024 石油化工仪表工程施工及验收规范.docx VIP
原创力文档


文档评论(0)