- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年煤矿机电队工作总结及2012年工作计划(国外英文资料)
2011年煤矿机电队工作总结及2012年工作计划
Work summary of coal mine electromechanical team in 2011 and work plan in 2012
2011 will soon be over, review this year, three teams in the mine electromechanical government under the correct leadership, earnestly implement the production and management of the mine issued, through the tireless efforts of all the workers to achieve safe production in 2011, the main work of this year the summary is as follows: the completion of a team, the equipment maintenance, installation and processing in mine issued indicators, and a level of the team in strict accordance with the requirements of higher authorities, the completion of all tasks assigned on time, the main work includes the following 1 aspects, installation and maintenance of this year well the maintenance of motor and pump, winch for more than 30 times; the two roller warehouse maintenance time; installation 6-22170, 0-22140, e d e 0-22150 two three, 6-22220 two and sub Ding machine multi points driving belt 6; on the other Outside the installation e two new head of a mountain high motivation and demolition of an old head. Install a water tank for an office building; change the gate to the north of the factory; install the 3 door of the family area. All these work save a lot of maintenance and installation costs for the mine. In particular, the installation of Ding, 6-22220, two, in overcoming the installation distance is far from the poor installation conditions, it took two days to complete, but also the fastest installation this year. 2, in coordination with combat, four teams of electrical and mechanical installation of reactor 2; assistance (reprinted from one million library network , one million library network, more than 1 million articles of secretarial templates, free download) Beishan replaced two transformer oil; assist the shop two 30 passengers. 3, processing mainly completed: the number of processing work completed this year is more than 30 thousand, the main proj
您可能关注的文档
- !!!变压器的要求和技术参数(国外英文资料).doc
- (上卷)重新学会笑--------中国式新森田教...(国外英文资料).doc
- (宁鸣)晨间(国外英文资料).doc
- (四)津液-(国外英文资料).doc
- (新版)高强轻质高温耐火砖生产制造制备及应用工艺专利技术文集(国外英文资料).doc
- (图解)普林斯顿进攻体系(国外英文资料).doc
- (第1章) 单片机教案(国外英文资料).doc
- (考试时间:70分钟 试卷满分:70分 考试形式:开卷)(国外英文资料).doc
- - 上海LNG加气站 上海CNG加气站博客上海LNG加气站 上海CNG加气站博客(国外英文资料).doc
- ...我相信能耐耐心心看完文章的人,不用再对手机这东西纠结了_百度文库...(国外英文资料).doc
- 2025年无人机低空医疗物资投放社会效益报告.docx
- 2025年再生塑料行业包装回收利用产业链重构研究.docx
- 《AI眼镜周边产品市场机遇:2025年终端销售与需求增长洞察》.docx
- 2025年坚果加工行业深加工技术突破与市场拓展策略报告.docx
- 2025年通信芯片行业技术竞争与未来趋势报告.docx
- 《2025年生鲜电商配送冷链事故分析与预防措施》.docx
- 《商业航天融资新趋势2025民营卫星企业资本涌入估值分析市场动态》.docx
- 2025年能源绿色健康行业创新技术与市场应用报告.docx
- 2025年无人机低空医疗救援通信方案分析报告.docx
- 2025年烹饪机器人行业市场集中度分析报告.docx
原创力文档


文档评论(0)