- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
moc(国外英文资料)
moc
Construction technology and key points of bored pile
Section 1 construction process of bored pile
The construction process of bored pile including site preparation, Pile Lofting, buried casing, drilling, hole cleaning, dipping steel cage, pouring concrete, the construction process as shown in figure 3-1. Bored pile construction is a high quality, must be completed in a short period of time in the process of underground hidden works, construction must be carefully carried out in accordance with the construction process.
Fig. 3-1 flow chart of bored pile
Second sections of construction preparation
3.2.1 pile driving
Placing piles means that the coordinates of the center point of the designed pile are put into the construction site with relevant instruments. The procedure of placing piles is to check the coordinates, to erect the instrument, to input the coordinates and to set aside the points.
(1) check the coordinates
This process is often ignored by many surveyors, and the coordinates given in the drawings may be wrong, so the coordinate calculation should be carried out before placing the pile in the field, and the coordinates can be checked in the form of Execel.
(2) erection of instruments;
The total station is located at the control point, fixed two brackets, telescopic third racks. The direction of the bubble in the round level is fixed on the same line as one of the two shelves, then the bracket is fixed and the bracket on the straight line is adjusted again. In general, as long as the level of fine, and then in the middle of the fine, you can, the prism at another control point as a rear view.
(3) input coordinates
The point coordinate of the pile number to be measured is input to the total station, and the total station can calculate the distance and angle between the control point and the measuring and setting point.
(4) release point;
Adjust the total station to make the lens direction measuring point direction error in the 2 left within the prism in t
您可能关注的文档
最近下载
- YS-T 578-2006 氟钽酸钾-行业标准规范.pdf
- 资本市场评级那些事.html.pdf VIP
- YS/T 427-2012_五氧化二钽 行业标准.pdf
- 糖尿病酮症酸中毒诊疗指南(中国2型糖尿病防治指南((2022年-2023年)版).docx VIP
- YST751-2024 钽及钽合金牌号和化学成分-报批稿.pdf VIP
- Dsc-931中文说明书.doc VIP
- (2025)患者发生非计划性拔管的应急预案.docx VIP
- 7.2《归园田居(其一)》课件(共18张PPT) 2024-2025学年统编版高中语文必修上册.pptx VIP
- 设计构成与应用:立体构成与应用PPT教学课件.pptx VIP
- 肝脏特异性对比剂对肝脏疾病诊断.ppt VIP
原创力文档


文档评论(0)