- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
咨询师:工程项目管理漫谈(国外英文资料)
咨询师:工程项目管理漫谈
A construction project from the formation of the concept, the application, feasibility analysis, project evaluation, market positioning, design, project preparatory work, construction preparation, selection and procurement, project mechanical and electrical equipment and main materials of organization, plan making, project quality and investment control, until the completion of the plan acceptance, delivery, through the work of many aspects of the indispensable. A part of any success will directly affect the success of the project, and the project management is throughout the whole process of the formation of the project, its management object is the specific construction project, and the scope of the administration is the formation of the whole process of project construction and management, it is different. Although the object of construction management is also the construction project, the scope of management is only the construction stage.
Keywords: feasibility study, cost management, investment control
Construction projects generally have a clear goal, but the goal is common: the effective use of limited funds and investment, with less cost, as fast as possible, and the good quality of the project completion project, to achieve the intended function of delivery, and obtain the expected economic benefits. In fact, we can simply think that the project management is to limit the duration, quality standards, investment quota. Disposable characteristics, clear management objectives and established the building use function and the need to achieve economic and social benefits etc. constitute constraints on the construction project, the project management limit under these constraints, but also makes the management of the project relative to other areas of management, complexity more obvious. The management is more difficult, higher management requirements.
There are many contents in engineering project management, but there are five main functions in det