网站大量收购独家精品文档,联系QQ:2885784924

cass的应用(The application of cass).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
cass的应用(The application of cass)

cass的应用(The application of cass) The 2011-4-10 00:01onsaturday (UK time) the best answer Input dot first input to excel, the first column, the second column input coding (can like naming or empty not lost), the third column input Y coordinates, the fourth column input X coordinates, the fifth column input level, and then save to CSV format comma, found direct to save the file. The CSV To dat. Open cass7.0 -- drawing processing -- the field point number is OK. Question number, number (or space), X, Y, Z - then save it to CSV format? Find the file name again and save it to dat format. And then you can show up, right? No reaction? Answer through the notepad to open the carefully check whether the format: 1,1,456789.000, 5678901.000, 111.000 Dot, code, Y, X, H (note: comma must be in the format of English input method) If it hasnt been done yet, it might have been your southern cass cracking down and looking for another one When pressed, the data is stored in dat format after the input data in excel. Enter data in notepad, save it, and open it again. Whats the reason? The answer is to save the CSV format and then change the suffix to dat Agree 2 | comments Reprint TAB 7.0 (2008-12-27 10:21:41) : miscellaneous: surveying and mapping zones CASS7.0 is a comprehensive digital mapping software feature, function and basic operation method, which is essential to master CASS7.0. This paper introduces the specific working methods of CASS7.0 in various digital mapping and management. The CASS7.0 system provides the integration of the inside and outside industries, e-plate forming and digital map of the old graph, etc. This paper mainly introduces the model of integration of internal and external industry. Similar to the previous version of CASS, the contents include the first level control of the test area, the control of the drawing root, the measurement of the separation amplitude, the measurement of the broken part, the arrangement of personnel, etc. Finally, a topographic map

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档