- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
guolu(guolu)
guolu(guolu)
1. Influence of water supply temperature
The water supply temperature is determined when the boiler is designed. The determination of feed water temperature depends on the boiler parameters (pressure) and capacity (rated load). Due to the increased with the parameters of the boiler, the amount of water in the boiler heating heat share rising (from water into superheated steam is divided into three stages) heating, evaporation, overheating, so you need to decorate more economizer. But want to arrange the economizer more will spend a lot of high-pressure boiler steel, on the one hand, on the other hand because with the increase of capacity of the boiler, there are no more space to decorate the economizer, therefore, the determination of feed temperature increased with the increase of the boiler parameters and capacity increases, the general medium pressure boiler design feed water temperature is 150 ℃ or so, around 215 ℃ high pressure boiler, superhigh pressure boiler around 240 ℃. In addition, decided to feed temperature economizer arrangement is also subject to the influence of the temperature of exhaust smoke, because the exhaust temperature is too low will easily lead to low temperature corrosion, exhaust temperature general design is about 140 ℃, and the large capacity boiler due to the use of rotary air preheater (we use tubular air preheater easy corrosion), exhaust smoke temperature is low can design more.
In the actual operation, it is generally believed that after the high addition of the turbine, the temperature of the feed water will decrease, which will lead to the increase of smoke exhaust temperature and the decrease of the thermal efficiency of the boiler. This view makes sense, is based on the premise that feed water at lower temperature, to ensure the evaporation capacity of the boiler, must add more fuel, causing convection heating surface of boiler heat increase, such as steam temperature will increase, so the exhaust temperature will
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
- 财务管理专业 企业并购财务风险分析与防范分析研究——以阿里巴巴并购网易考拉为例.docx
- 财务管理专业 企业并购的财务风险管理研究分析-以美的并购库卡为例.docx
- 财务管理专业 沃尔玛存货管理问题研究分析.docx
- 财务管理专业 福安药业财务风险分析及防范策略分析研究.docx
- 财务管理专业 白象公司成本管理研究分析.docx
- 财务管理专业 云南白药股份有限公司营运资金管理研究分析.docx
- 工商管理专业 中通快递培正站点服务质量评价研究分析.doc
- 房山区良乡地区洗车行业管理现状的调查报告分析研究 公共管理专业.docx
- 第二单元文化传承与创新 测试练习题.doc
- 必修2第一章第三节化学键四星题.doc
最近下载
- 拼多多财务报表分析.pdf VIP
- 普通高等学校本科教育教学审核评估 自评报告 (第二类第一种).pdf VIP
- 《销售人员心态培训》课件.pptx VIP
- [临沧]云南临沧市临翔区教育体育局临翔区城区部分学校调配教师89人 笔试上岸试题历年典型考题及考点剖析附答案详解.docx
- 就这900句玩转口语纯正的美国本土活语言就这900句玩转口语.pdf
- 销售人员心态培训课件.pdf VIP
- 模块风冷机组系统设计方案.doc
- 2022—2023学年北师大版数学七年级上册第二章有理数及其运算单元测试卷含答案 .docx
- 建筑信息模型理论知识考试样题、实操技能考核样题、建模图纸.pdf VIP
- 01:科学新知 Future food -2023中考英语外刊阅读原创试题(全国)-中考英语备考资料重点汇总知识点归纳.docx VIP
文档评论(0)