压力管道考核试题2005(Pressure pipeline assessment test item 2005).docVIP

压力管道考核试题2005(Pressure pipeline assessment test item 2005).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
压力管道考核试题2005(Pressure pipeline assessment test item 2005)

压力管道考核试题2005(Pressure pipeline assessment test item 2005) 2005 pressure pipeline designer examination paper Name: Units: Results: 1. (1 point, 20 points) 1. The storage tank area, loading area and chemical dangerous goods warehouse area of flammable liquid shall be in a circular elimination lane. When the condition is limited, it can also be equipped with the end of the fire lane. GB50160. P7. 3.3.5 (square root,) 2. The open fire heating furnace shall be centrally arranged on the edge of the device, and the wind direction of the minimum frequency wind direction of the combustible gas, liquefied hydrocarbon and a B type liquid equipment shall be on the wind. Training and teaching materials. P128.5.1, 23. (1) (x) 3. The control room Shared by two or more joint installations or devices shall not be smaller than 15m in case of a, b or open fire; Should not be smaller than 9m. Training, teaching materials. P134.5.1.39 - (x) 4. Equipment layout design should meet the requirements of technological process, safety production and environmental protection, and should consider the overall layout of the plant; Operation, maintenance, overhaul, construction and fire control; Save land and reduce, Less energy consumption. Training materials. P123.5.1.9 (square root) 5. When determining the location of the equipment and structure, the ground shall be made, the base of the lower part, beyond the boundary of the device. Training materials. P123.5.1.10 - (9) (x) 6. Two kinds of materials for heat exchange and heat exchangers should be arranged in the nearest position of the two materials import and export pipelines. Training materials. 7. Above the compressor, no cloth shall be made, and the equipment of type A and b shall be used. Training materials. P131.5.1.28-3 (x) Boiler room layout. Arrange the fuel in front of the furnace, adjust, feed water adjust and steam temperature control valve group. Training materials. P151.5.1.87 - (1) (x) 9. The effective volume of the fire embankme

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档