岗位知识(Job knowledge).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
岗位知识(Job knowledge)

岗位知识(Job knowledge) 1. Single item selection: 1. The loss rate of the known bricks is 1%, and the consumption (B) of 240 x 190 x 90 (B) is calculated. A. 208 b. 210 c. 211 d. 213 2. Dig 1 m3 basic working time earth takes 60 min, auxiliary work time accounted for 4% of working duration, ready to end time, inevitably interrupt time, rest time respectively work duration ratio of 1%, 1% and 1%. To calculate the yield quota (D) of the excavation project. A. 0.17 B. 0.74 C. D. 1.35 5.92 3. Some engineering concrete component volume is 140 m3, every day there are 23 professional workers in cast concrete with time to fulfill the project quota of man-days 1.08 / m3, try to calculate cast concrete components required to complete the project quota construction days (C). A. 5 B. 6 C. 7 D. 8 4. The masonry wall of 10m3 is known to consume 9.94 m3 of aerated concrete blocks, M5 mixed mortar 0.8m3, and now a project has a masonry wall 4680 m3, which needs to be prepared (B) materials. A. Aerated concrete block 4652 m3, M5 mixed mortar 374.4 m3 B. Air concrete block 4652 m3, M5 mixed mortar 400.6 m3 C. Gas concrete block 4708 m3, M5 mixed mortar 585m3 D 5. The amount of circulating materials in the quota refers to (A). A. Sales volume b. turnover amount C 6. The size of the wall brick is 200mm x 300mm x 6mm, the grey seam is 8mm, the surface brick loss rate is 1.5%, and the test calculates the surface brick consumption (D) of 100m2 metope. A. 1536 b. 1559 c. 1561 d. 1584 7. Some engineering foundation earthwork 1600 m3, the use of digging bucket capacity of 0.5 m3 backhoe excavator digging, excavator affecting yield is 70 m3 / machine-team, if required to complete the excavation work in 5 days, (B) excavator needed? A. 4 B. 5 C. 6 D. 7 8.400 L concrete mixer for a continuous cycle of 250s, the mechanical utilization coefficient of 0.85, and the output of mixer shift (D). A. 4.61 m3 / taipan B. 4.9 m3 / taiban c.36.86 m3 / taipan d. 39.17 m3 / taiban 9. The external wall of 100m2 i

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档