技术交底-大理石、磨光花岗石、预制水磨石饰面(Technical background - marble, polishing granite, precast terrazzo finish).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
技术交底-大理石、磨光花岗石、预制水磨石饰面(Technical background - marble, polishing granite, precast terrazzo finish)
技术交底-大理石、磨光花岗石、预制水磨石饰面(Technical background - marble, polishing granite, precast terrazzo finish)
The technical background is applicable to the wall, cylinder and door window cover of industrial and civil buildings, marble, polishing granite and precast terrazzo
Decoration panel decoration project.
1. Material requirements
(1) cement: no. 325 Portland cement. There should be factory proof or duplicate test sheet, and when the factory exceeds three months, the test result will be used.
(2) sand: coarse sand or medium sand, before use, the sieve.
(3) marble (or precast terrazzo and polishing granite) : according to the specifications of the design drawing. No hidden injury on the surface,
Defects such as weathering.
Should not be packed in faded materials.
(4) other materials: gypsum, copper wire or galvanized lead wire, lead skin, supporting pieces (galvanized or stainless steel connectors), no. 325 white cement;
It should be equipped with a variety of stone slag and mineral pigments that are in the color of marble or precast terrazzo, polished granite slabs; 107 glue and stuffing
A special plastic hose with a slit in the panel.
2. Main equipment
Scale, iron plate, bucket, small bucket, iron dustpan, spade, trolley, plastic hose, rubber cup, spray pot, alloy steel flat chisel, close
Gold steel drill bit (phi 5, perforating), operating bracket, bench drill, iron horizontal ruler, square ruler, feet board, bottom ruler (3000 ~ 5000 x 40 times 10 ~
15mm), topline, line hammer, powder line bag, high stool, wooden wedge, small table grinding wheel, cutting marble grinding wheel, full cutting machine, cutting tool, ash
Board and lead skin (1mm thick), wood trowel, iron trowel, fine wire brush, broom, size hammer, small white line, lead wire, wipe or cotton, pliers
Son, shovel, box ruler, nails, red pencil, brush, tool bag, etc.
3. Operating conditions
(1) the work of a few types of work (water, electricity, ventilation, equipment installation, etc.) shall be completed in a
您可能关注的文档
- 工程项目管理选择判断(Project management selection judgment).doc
- 工艺学复习(Process review).doc
- 工程项目管理法(Engineering project management).doc
- 工艺流程指标控制与工艺(Process indicator control and process).doc
- 工量具分类(Classification of works).doc
- 差动技术(The differential technology).doc
- 巴西利卡(In Brazil,).doc
- 工程测量资料(Engineering survey data).doc
- 市售蛋糕含有很多添加剂(The market cake contains many additives).doc
- 市电供电的LED驱动控制器A704(The LED driver controller A704).doc
文档评论(0)