- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥隧复习(Review the bridge sui)
桥隧复习(Review the bridge sui)
Chapter I introduction
The largest span prestressed reinforced concrete beam bridge is the zhejiang ruian feiyun rivers bridge span 62 m, the worlds largest span beam bridge was built in 1977 Austria ALM (ALM) bridge, span of 76 m.
The worlds largest span of steel-fine concrete arch bridge, chongqing wanzhou Yangtze river bridge, spans 420m. In January 2005, the wushan Yangtze river bridge was built in chongqing, which is a central steel and steel concrete arch bridge. The main span is 460m, and the world record is set again.
The worlds largest span bridge is the Ming shi strait bridge in Japan, and the main span is 1991m.
The jiangsu sutong changjiang highway bridge, which was completed in May 2008, is the largest span cable-stayed bridge in the world.
The bridge consists of four parts: superstructure, lower structure, subsidiary structure and support system. The superstructure is also known as span bridge structure, including bearing structure and bridge system. The lower structure includes pier, abutment and foundation. The ancillary structure includes the bridge head embankment, the revetment and the guide structure.
1. The main dimensions and nomenclature of the bridge:
Calculate the distance between the span bridge structure and the bridge structure. The arch bridge is the horizontal distance between the center of gravity of the two arches.
The net span is calculated as the net distance between two adjacent pier (table). The horizontal distance between the inner edge of the bridge and the lowest point of the arch bridge has become a net span.
The distance between the middle line and the front edge of the bridge pier is the standard cross-diameter beam bridge; The arch bridge is a net span.
The bridge of the bridge is the distance between the abutment wall or the end of the wall between the two sides of the bridge, and the bridge of the bridge is the length of the roadway.
The ratio of the cross ratio of the arch bridge to the calcul
您可能关注的文档
- 技术交底-大理石、磨光花岗石、预制水磨石饰面(Technical background - marble, polishing granite, precast terrazzo finish).doc
- 技术小题(Technology item).doc
- 技术要求一般模板(Technology requires general templates).doc
- 承台专项施工安全方案(Special construction safety plan for Taiwan).doc
- 技术要求汇总(只做参考)(Technical requirements summary (for reference only)).doc
- 技能大赛(Skills contest).doc
- 技能鉴定简答(The skill appraisal is simple answer).doc
- 抓住狗狗的心理(Hold the dog's mind).doc
- 投影机常见故障判断(Common failure judgment of the projector).doc
- 技术要求需要写的那些东西(The technical requirements that you need to write).doc
- 柴油机不能启动(The diesel engine cannot be started).doc
- 梁场取证资料(Beam field forensics data).doc
- 梁启超先生诗词选(Mr. Liang qichao's poetry anthology).doc
- 梁思成生平简介(Biography of liang sicheng).doc
- 检修汽车离合器(Overhaul the car clutch).doc
- 梳风——基于风环境问题的生态摩天楼(Comb wind - ecological skyscraper based on wind and environmental problems).doc
- 检察工作科学发展与检察改革(Procuratorial work science development and inspection reform).doc
- 检测命令(Detection of command).doc
- 检测技术实验(Test technology experiment).doc
- 检漏细则(Leak detection rules).doc
最近下载
- 市政基础设施工程施工现场质量管理标准化.doc
- 手机照片视频误删后的恢复方法.doc VIP
- 一例无法控制大脑的心理咨询案例——以人为中心疗法取向.pdf VIP
- [教你如何制作KTV歌曲VOD歌曲KTV歌曲库.doc VIP
- 照明设计软件:AGI 32二次开发_AGI32数据管理与优化.docx VIP
- 第五届潍坊市职业技能大赛城市管理网格员题库及答案(760题).docx VIP
- 鼻肠管滑脱的应急预案.pptx VIP
- DGT 801系列数字式发电机变压器组保护装置技术说明书.pdf
- 广东省肇庆市怀集县事业单位考试真题每日一练带答案解析(2021年03月02日).docx VIP
- 农村教师公开选调进城考试模拟试题1(初中地理·附参考答案).docx
文档评论(0)