水电安装施工操作规范(Specification for installation and construction of hydroelectric power).docVIP

水电安装施工操作规范(Specification for installation and construction of hydroelectric power).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电安装施工操作规范(Specification for installation and construction of hydroelectric power)

水电安装施工操作规范(Specification for installation and construction of hydroelectric power) Specification for installation and construction of hydroelectric power First, the horizontal line must be measured before entry. And check whether the original to acquit the pipe is blocked, whether total valve opening and closing flexible closely (for close the imprecise brake shall require the owner to contact tube timely changing into air tightness of stop valve); 24h water - raising test on the kitchen surface. Check to see if the original source line size, line, TV line, broadband connection are in place. 2. Check the location, size and model of furniture, electrical appliances, sanitary fixtures and socket switches. If there is any discrepancy, please consult with the landlord and adjust it according to the actual situation. If the landlord proposes to change the design scheme, the construction worker should be informed in a timely manner so that the engineer can follow the relevant procedures. 3. Pipe and fittings shall be inspected before construction of pipes and fittings. If new coated pipe shall be to the water meter box, all should be special reasons can not replace the original water pipes, use original part of the pipe shall be do water and pressure test, to determine the presence of blocking leakage and other anomalies. The pipe with obvious scar shall not be used, and the tube mouth shall be full circle with special tool. The cutting should prevent the pipe from being deformed. The end face of the pipe incision should be perpendicular to the axis of the pipe, and the burr of the incision should be cleaned in time. All tubes are in hot water pipes. 2. The selection of pipes shall comply with the design requirements. The main pipe diameter of main pipe is 20mm diameter (PP - R tube is 25mm diameter). The main pipe diameter of villa and loft should be determined according to the actual flow value of the indoor water pipe network. Determine the implement should be taken b

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档