- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
河南安装03版定额部分解释(Henan installation 03 quota partial explanation)
河南安装03版定额部分解释(Henan installation 03 quota partial explanation)
1. The construction unit and the installation unit of an engineering construction project shall sign construction contracts with party a respectively. During the construction process, the installation unit shall arrange the construction materials on its own, and submit it to the civil construction unit for inspection. Q: does the construction contractor collect fees from the installation unit?
Answer: the construction unit and installation is the equality of main body, and the construction units did not substantially for materials of completion of installation unit, therefore, the civil parties can only cooperate with charge to party a, cant charge the installation unit total package fee.
2. What is the meaning of 4 # in P99 pages 9-216 of P99 in the air conditioning project quota of volume 9?
A: the length of the diameter of the impeller in the fans impeller is the length of the 4 # in the 4 # of the p99-9-216 in the air conditioning engineering quota of volume 9.
3. The pipe diameter of the steel and flexible waterproof casing is the diameter of the casing nominal diameter or the directors nominal diameter in the casing.
Answer: the nominal diameter of the steel and flexible waterproof casing quota in the quota refers to the nominal diameter of the supervisor in the casing.
4. When a construction unit is working on the bridge frame, the straddle between the two bridge frames adopts the lj-16 bare copper wire, and the ends are bolted to the end. Q: can this connection be applied to grounding transwiring? Answer: cannot apply ground to cross line subeye. The work content of the installation quota of the bridge has included the grounding content.
5. Q: is there any mistake in the unit kg of the material galvanized steel plate delta 0.5, which is installed in version 3 of the quota of 11-to-2199 ~ 11-2203? Answer: 11-2199 ~ 11-2203. The unit kg of galvanized steel plate is wrong. The correct one should be
您可能关注的文档
- 旅游规划应着力的八个要点(Eight key points for tourism planning).doc
- 旅行须知(Travel information).doc
- 旅馆名词(The hotel noun).doc
- 旋挖钻机在泥岩地层施工的工法规律(The law of construction of a rotary drill rig in mudstone formation).doc
- 旋转机械故障诊断(Rotary mechanical fault diagnosis).doc
- 无人岛物语4修改(No one island object 4 modifies).doc
- 无公害食品(Harmless food).doc
- 无休无止的漏雨 屡补屡开的裂缝 岭南新世界质量问题多(The endless leakage of rain continues to open the new world quality problems of lingnan new world).doc
- 无因管理与不当得利学习笔记(No management or improper enrichment study notes).doc
- 无功产生(Reactive power generated).doc
- 河南省标准设计图集目录(The standard design atlas of henan province).doc
- 河南省著名的企业及企业家(Henan province famous enterprises and entrepreneurs).doc
- 河南驾照考试模拟试题(Henan driver's driving test simulation test question).doc
- 沙迪克代码大全(Sadiq code base).doc
- 油气井常用封隔器(The packer is commonly used in oil and gas Wells).doc
- 油漆调色(The paint color).doc
- 油漆的分类 与工艺(Classification and process of paint).doc
- 油碱生产方法技术资料,油碱的织物整理方法,油碱的组合物(Oil alkali production method technical data, oil alkali fabric finishing method, oil base composition).doc
- 治理车辆超限超载工作百日行动阶段工作小结(To control the overloading of vehicles and the work of 100 days operation).doc
- 沼气综合利用(Biogas utilization).doc
文档评论(0)