煤矿地质测量操作规程(Operation procedures for geological surveying of coal mine).docVIP

煤矿地质测量操作规程(Operation procedures for geological surveying of coal mine).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
煤矿地质测量操作规程(Operation procedures for geological surveying of coal mine)

煤矿地质测量操作规程(Operation procedures for geological surveying of coal mine) Operation procedure of coal mine survey 1. In handling and surveying, the instruments and tools must be properly protected. When the instrument is set up, the station (and the mirror station) are not allowed to leave. When the station is moving, the instrument must be unloaded into the instrument box. If the distance of the station is short, the instrument may not be removed, but the instrument must be held and the feet are held by hand. Dont jump or run as you travel. 2. Measurement of external observation should be conducted in a time of good visual and stable imaging. If the image is blurred or jumpy, it should not be observed before and after sunrise, sunset and around noon. The measurement of triangulation can also be used to observe the time of atmospheric refractive index. 3. During the observation of high marks and constructions and structures, the operator shall wear a safety belt. Effective measures should be taken in the upper and lower parts of the instrument. The instrument box and other utensils should be placed firmly, and the fall shall be strictly prevented to ensure the safety of the instrument and person. 4. During observation, the following requirements shall be made: (1) when the instrument turns to be stable, the target should be placed near the horizontal wire when the telescope is aiming at the target. The other targets are observed in the order of observation. The final rotation direction should be the precession when using the micrometer screw target or the micrometer helix to align the line. (2) every time the target is set, it is not allowed to tighten the horizontal and vertical fixed spiral, and use the middle part as far as possible. (3) in the observation process, the bubble deviation center of the standard of the standard shall not be more than one lattice, and when approaching a lattice, the equipment should be retaken in the regenerator. (4) when the telescope

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档