- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
监理检查要点手机存放(Supervision check point cell phone storage)
监理检查要点手机存放(Supervision check point cell phone storage)
The key points of supervision control for each process of construction
Detailed drawings, especially structure and other instructions, should be read before all project supervision
1. Positioning line: check whether the positioning is consistent with design and planning, level points should be known, base elevation and
Axis dimension inspection.
2. Earth excavation: whether the soil quality is consistent with the geological survey report, whether it reaches the holding level of the geological survey, the elevation and the axis
Whether the line size is in accordance with the drawing and whether the base floating soil is cleaned up and is required to be a drill.
3, rubble masonry: field measurement, witness, check the formulations of cement mortar masonry is the first big stone, to bedding face down, pressing seam, mortar joint control in 3 cm long, pay attention to every masonry section of the width and height to consistent with the drawings, the actual amount, pay attention to the rubble masonry upper to pressure lower big foot rest, pay attention to the mortar joint yan, when laying upper freestone nowadays dont have a mortar rubble to reveal freestone surface, check cant use of masonry mortar instead of small stone filling, 600 wide rough wall to a drawing stone, concrete request to set the standard, MAO stone over the upper level of the mortar cannot be more than 2 cm, if more than 2 cm, with a concrete leveling. The gross stone part of the hole is to be played over the beam, not a large piece of rubble.
4, independent foundation: check foundation pile caps is controlled drawing template section size, reinforcement to try testing qualified before trial, foundation slab reinforcement binding tie clasp the outer 2 jin the whole middle button can bind the plum blossom, pay attention to in any case, the direction of the floor long tendons in the lower part, the slab reinforcement drawings, are applied, the colum
您可能关注的文档
- 混凝土地下室墙裂缝渗漏的分析与处理方法(Analysis and treatment of crack leakage of concrete basement wall).doc
- 混凝土杂文集精(The concrete omnibus).doc
- 混凝土外观缺陷及控制(Concrete appearance defects and control).doc
- 混凝土计算(Concrete calculation).doc
- 混凝土设计原理复习资料总结(Summary of concrete design principle review data).doc
- 混凝土设计题目(Concrete design topic).doc
- 混凝土试块送检(Check the concrete test block).doc
- 混凝施工质量缺陷处理(Quality defects of coagulation construction).doc
- 混床操作(Operation of the mixed bed).doc
- 混凝土试题(Concrete test).doc
- 监理规划范文(The supervision plan model).doc
- 盘山县职教化工仪表写字板(Panshan county vocational education chemical instrument writing board).doc
- 盘根生产的可持续发展(The sustainable development of pangen production).doc
- 盘点20位商业巨子的财富人生和经典语录(全文)(Wealth life and classic quotes from 20 business titans (full text)).doc
- 盘式制动器(一、二、三)——译自英国LUCAS技术手册之六(Disc brakes (one, two, three) - translated from the British LUCAS technical manual six).doc
- 盛世治水新跨越新中国成立60周年水利发展综述(A review of the 60th anniversary of the founding of the People's Republic of China).doc
- 直播综艺节目中主持人的应变技巧(Live variety show host's coping skills).doc
- 直立闭环+CCD(Vertical closed loop + CCD).doc
- 直线与平面平行的判定教学案例设计汇编(The design of the case design of the line and plane parallel).doc
- 直线位移传感器(Linear displacement sensor).doc
文档评论(0)