- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脚手架搭设规范施工方案(Scaffolds shall set up a standard construction plan)
脚手架搭设规范施工方案(Scaffolds shall set up a standard construction plan)
Scaffolds shall set up a standard construction plan
1, before the scaffold erection, shall be determined according to the characteristics of the type of work and the construction technology of the erection plan, content should include: set-up requirements, distance between bar and foundation treatment, even the wall pole position setting, connection methods, and map drawing and details.
2. The setting height of the scaffold exceeds the specification and shall be calculated.
(1) when the steel pipe scaffold is fit for the following table, the design calculation shall not be carried out. However, the design of the wall and the foundation bearing capacity shall be calculated according to the actual load and the construction drawing shall be drawn.
(2) when the height is 25-50m, the overall stability of the scaffold should be strengthened from the structure. Such as longitudinal bracing must be set up in a row, increase the lateral bracing, even the wall rod strength increase, narrow spacing, and in windy areas for the scaffold erection height more than 40 m, considering the wind vortex over power, should be in the set level even the wall at the same time, should also rise over flow resistance role even wall measures, to ensure the safety of the use of scaffolding.
(3) when the erection height more than 50 m, can adopt double stud strengthen or by subsection unloading, along the high block the scaffolding and scaffolding full use wire rope hanging beam slab structure, the scaffolding, part of the load to the building; Or use a section to set up the scaffold to be borne by the projecting beam of the building, the frame bearing, and the design calculation.
(4) the design calculation of the scaffold shall conform to the relevant provisions of the scaffold specification and shall be examined and approved by the head of enterprise technology.
3, scaffolding construction scheme should be consistent with construc
您可能关注的文档
- 硒鼓使用常识(Use common sense).doc
- 硕士学位申请书填写(Application form for master's degree).doc
- 硕士毕业论文查重样本(Master's thesis to look up the sample).doc
- 硫酸法生产钛白粉水洗工艺真空系统设计改造方案与思路(The design and modification of the vacuum system for titanium dioxide washing process by sulphuric acid method).doc
- 硬盘知识(Knowledge of hard disk).doc
- 确定模具类型的主要结构(Determine the main structure of mold type).doc
- 磁性材料在汽车电子中的应用与市场(Application and market of magnetic materials in automotive electronics).doc
- 磁力泵的结构特点及使用与维修(Structural characteristics and use and maintenance of magnetic pump).doc
- 磁极变换(The magnetic poles transform).doc
- 磁盘阵列概念详解(The disk array concept is detailed).doc
- 脚手架施工方案(Scaffolding construction scheme).doc
- 脚本命令大全(Script commands are complete).doc
- 脱扣特性如何选(How to choose the trip feature).doc
- 脱离操作系统的bootloader—44binit.s的注释(The annotation of bootloader - 44binit).doc
- 腓骨弯曲骨折的X线诊断(The X-ray diagnosis of the fractured fibula fracture).doc
- 腐植酸钠(Humic acid sodium).doc
- 膨胀加强带(Expansion band).doc
- 膨胀土的特性与危害(The characteristics and hazards of expansive soil).doc
- 自 然 养 鸡 新 技 术(New techniques for raising chickens).doc
- 自主品牌挺进第二极(The independent brand advances to the second pole.).doc
文档评论(0)