脚手架施工方案(Scaffolding construction scheme).docVIP

脚手架施工方案(Scaffolding construction scheme).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脚手架施工方案(Scaffolding construction scheme)

脚手架施工方案(Scaffolding construction scheme) I. preparation of the basis 1. Safety technical specifications for high work safety in building construction (jgj80-91) Safety technical specifications for structural steel pipe scaffolding (JGJ130 -- 2001) 3. Construction drawings of this project 4. Design of this project construction organization Second, the general situation of the project The project is a residential project developed by * * * * * * * * * real estate development co., LTD. The project is located at the north side of the huanglong road north of * * *. The total construction area is 95034.1 m2, B3 building area is 48869.52 m2, and the garage area is 46164.58 m2. The garage floor, 28 layer, the main building height of 84.90 m, building fire resistance rating: level, level of roofing waterproof: Ⅱ level, aseismic levels: level 3, the seismic fortification intensity: 6 degrees. Construction safety grade level, the construction design service life is 50 years. The foundation is the artificial excavation pile foundation. Main shear wall structure. Brick is sintered shale solid brick, hollow brick and gas concrete block, exterior decoration is exterior wall paint and exterior wall brick etc. The project contract works for 600 days and the project quality objectives are qualified. Iii. Scaffold design and setting parameters The scaffold outside the main building of the B3 project is to be fully enclosed and suspended with two exclusion scaffolds. It is planned to be set on the second floor and above, mainly in the form of a steel wire rope slant. The height of this project is 3.0 m, so it is calculated by 3.0 m. (see figure 1) The scaffold steel tube is selected for the use of phi 48 x 3.5; Overhanging steel channel using [18, length of about 2.9 meters (4.5 m) the balcony for; fixed channel steel on the floor with 2 ф 16 round steel anchor ring, is apart from the outside wall of 1.3 meters. Poling longitudinal spacing of 1.5 m, 0.35 m wall stud from the, from outs