超声波无损探伤技术操作规程(Technical operation procedure of ultrasonic nondestructive flaw detection).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
超声波无损探伤技术操作规程(Technical operation procedure of ultrasonic nondestructive flaw detection)
超声波无损探伤技术操作规程(Technical operation procedure of ultrasonic nondestructive flaw detection)
1.1 equipment overview
URP350, S type ultrasonic flaw detection equipment is to use the principle of ultrasonic detection tube inside and outside surface longitudinal, transverse defects and to measure the wall thickness of the steel a joint nondestructive testing equipment, its main flaw detection host, steel pipe conveyor system and water system SeBei composition and so on
1.2 main parameters
1.21 test tube diameter: 114 ~ 273.1 mm;
1.2.2 test steel pipe wall thickness: 4.8 ~ 25mm
1.2.3 surface temperature of steel tube: less than or equal to 80 degrees
1.2.4 length of pipe end blind area: less than or equal to 200m
2 safety confirmation and inspection
2.1 before operation, check whether all parts of the equipment are normal, but the task is not safe
2.2 no further operation of the crane
3. Operation procedure
3.1 pre-boot operation
3.1.1 with the diameter of steel tube, select the suitable wear-resistant contact boots and install them well
3.1.2 install the support arm to the correct height, and tighten the pivot bolt with the wrench
3.1.3 install the device in the correct position and tighten it
3.1.4 replace the casing ring with appropriate specification and lock it in the correct position
3.1.5 the scraping plate at the water entrance has been replaced with the appropriate specification
3.1.6 the correct tube diameter of the steel tube on the touch screen
3.1.7 the lifting platform has been moved to the correct height
3.1.8 check the calibration device has moved to the correct height,
3.1.9 inspection clamping roller has moved to the correct height
3.1.10 connect the water pump on the touch screen,
3.1.11 URP350 / S rotating head is either in the online position or in an off-line position
3.1.12 ensure that the off-line calibration device is compatible with the correct specification pipe diameter
3.2 the rotating head begins to rotate before rotation
3.2.1 Castell keys mu
您可能关注的文档
- 船用锅炉燃烧装置工作原理(Working principle of Marine boiler combustion unit).doc
- 自行车介绍(Bicycle introduction).doc
- 自行车爬坡耐力训练法(Bicycle climbing endurance training method).doc
- 船舶图纸常用英语词汇(The drawings of the ship are commonly used in English vocabulary).doc
- 船舶操作性要求集中检查活动指南(Ship maneuverability requires centralized inspection of activity guidelines).doc
- 船舶辅机英语词汇(English vocabulary for Marine auxiliaries).doc
- 色彩搭配含义(Color collocation meaning).doc
- 色度检测(Chromaticity detection).doc
- 色母料的作用(The role of the color masterbatch).doc
- 艾伯伦异世界设定(The Abelian alien world setting).doc
- 超市防盗措施(Supermarket anti-theft measures).doc
- 超声波检测(Ultrasonic testing).doc
- 超市心理学(Supermarket psychology).doc
- 超市陈列(The supermarket display).doc
- 超磁致伸缩换能器的建模方法(Modeling method of supermagnetostrictive transducer).doc
- 超级玛丽一代攻略(Super Mario generation strategy).doc
- 超长超全的驾驶知识(Ultra long driving knowledge).doc
- 越狱系类精彩对白(The escape department has wonderful dialogue).doc
- 越过翻译这座山(Across the translation of the mountain).doc
- 越野变速箱——手动的好还是自动的好(Cross-country gearbox -- manual or automatic).doc
文档评论(0)