施工工艺大全套管成孔灌注桩施工(Construction of the construction process big full casing hole filling pile construction).doc

施工工艺大全套管成孔灌注桩施工(Construction of the construction process big full casing hole filling pile construction).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工工艺大全套管成孔灌注桩施工(Construction of the construction process big full casing hole filling pile construction)

施工工艺大全套管成孔灌注桩施工(Construction of the construction process big full casing hole filling pile construction) Construction of casing hole filling pile Into casing hole filling pile with hammer hammer or vibration pile driving machine, set with a flapper pile tip or reinforced concrete precast pile tip (boots) steel pipe hammer or vibration sink into the soil, then pour concrete, with volume field tube drawing machine or while vibration extubation pile. Its technological characteristics are: can adapt to more complex stratum, can use small pile tube to make bigger section pile, carrying capacity is big; The casing wall can avoid the defects such as slump, choke, pull, shift and empty. Can be able to sink, construction speed, high efficiency, simple and safe operation. The technological standard is applicable to the basic soil of industrial and civil building, which is generally cohesive soil, silt and silty soil. A bit of sand soil and filling soil layer are used in the hole filling pile engineering. Chapter 1 material requirements 1. The cement Use 425 ordinary cement, slag cement or volcanic ash cement to ask for fresh and no lumps. 2. The stones The gravel size is not greater than 50mm; The gravel diameter is not greater than 40mm; The gravel size of the reinforced pile should not be greater than 30mm, and it should not be more than 1/3 of the minimum net distance of the reinforcement. 3. The steel bar The varieties and specifications should be adopted according to the design requirements. Chapter 2 main machine tools 1. Hammer strike pile equipment As a general hammer, hammer, diesel hammer, steam hammer, etc., are composed of pile, pile hammer, pile pipe, etc. The diameter of pile pipe is 270 ~ 370mm, and it is 8 ~ 15m long. 2. Vibration sinking pile equipment It includes DZ60 or DZ90 vibrator, DJB25 type walking bracket, hoist, pressure device, pile pipe, pile tip or reinforced concrete precast boots, etc. The pipe diameter is 220 ~ 370mm, 10 ~ 28m. Machinery and eq

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档