施工常见问题(Common problems in construction).doc

施工常见问题(Common problems in construction).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工常见问题(Common problems in construction)

施工常见问题(Common problems in construction) I. reasons and preventive measures of cracks in the building floor Firstly, the cracks in the floor cracks caused by the cracks in the prefabricated hollow slab are mainly due to the following points: 1, because the workers in the process of filling and sewing, failed to clean the joints of the blocks and blocks, mortar, such as residue, crack seal surface and dry, but its really hard to make seam filling and expansive concrete with fine stones and floor firmly bonded together, between the concrete and floor slab cracks; 2. In the process of cracks in the seam, the designer sets some of the wires in the seam to make the cracks in the cracks in the cracks in the cracks, or the cracks in the floor. 3. In the construction, the floor slab will be stabilized by the installation of floor slab without cement mortar and no slurry installation. When the floor is subjected to load, the shift of displacement is made, causing the adjacent floor to be staggered up and down, causing the fissure. 4. Due to the lack of the design strength of the concrete in the cracks, the construction load can be carried out prematurely and cracks are created. 5. During the hardening process of the concrete in the cracks, as the strength increases, it also produces shrinkage deformation and cracks, causing the floor to crack. For the above reasons, the main prevention measures are: (1) the design should be suitable for the width and width of the width plate. In general, the steel bar of 100mm shall be equipped with the lifting mode at the bottom of the board, and the expanded concrete of the c20 fine stone shall be filled to make the joint and the slab form a whole. (2) when designing, not to set the wire tube in the seam of the plate, avoid the sealing of the plates. (3) try to use concrete expansions to avoid the use of regular concrete to resist the deformation of concrete. (4) carefully clean up the residual debris in the plates, flush the floor with cle

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档