简述工程索赔技能(Describe engineering claim skills).docVIP

简述工程索赔技能(Describe engineering claim skills).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
简述工程索赔技能(Describe engineering claim skills)

简述工程索赔技能(Describe engineering claim skills) To facilitate the discussion of the topic of this article, we have a case study. A company to undertake a target of civil engineering, treaty price is 50 million yuan, a treaty time limit for a project for 18 months, the treaty defined: delay time each day, fines of up to 1000 yuan; every 1 day earlier period, reward 1000 yuan. The following issues are generated during the construction process: 1. The first layer to five reinforced concrete wall column concrete strength grade, total statement annotations for c35, layout and construction details for c40, shown on the bill of quantities of no c40 concrete column wall project, the only c35 reinforced concrete column wall project. In bidding for a project, the company invented the situation, but thought, after the company through the analysis of the defects can be used, so pretend not informed, column and reinforced concrete wall c35 project to quote low price a little, at first the company won the bid. Company appearance after construction, in view of this situation to construct professional staff made a special analysis, the conclusion is that bearing capacity of the layout for satisfaction, must accept c40 concrete and think they can accept plan changes and claim two style to deal with, but because of the pull even the quantity is big, the response capability is high also, cumbersome procedures and claim for compensation, the claim funds in place, not easily think embrace change plan way is a good style. Therefore, the company has made contact with the planning institute, the developer and the site supervision, analyzed the situation, and quickly lost the differences and approved the procedures. 2. During the construction of the main body, a total of 25 days shall be completed by the confirmed temporary outage. With the rapid growth of the economy, Chinas managers are also rapidly growing, and we are seeing more and more twenty-seven - and eight-year-old directors, who mana

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档