- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管理03(Management 03)
管理03(Management 03)
Construction management organization of 2Z101020
I. the concept of system
System depends on the observation of the objective things: an enterprise, a school, a research project or a construction project can be regard as a system, but the different systems of different goals, thus forming the organization concept, methods and organizational means also is not the same, the above all kinds of operation mode of the system is also different.
The construction project as a system has its distinct characteristics compared to the general system, such as:
(1) the construction project is a one-off; there are no two identical projects;
(2) the whole life cycle of construction projects usually consists of decision-making stage, implementation stage and operation stage, each stage of the work tasks and work target is different, their unit is not the same, to participate in or involve long time its whole life cycle;
(3) the task of a construction project is often composed of multiple, even many, many units to complete together, their relationship of the majority is not fixed, and some units involved in the interests of the different, even opposite.
Therefore, the above characteristics should be fully considered when considering the organizational problems of a construction project or the organization design of project management.
The relationship between the objectives of the system and the organization of the system
The main factors that affect the realization of a system target are the following two (as shown in FIG. 2z101020-1) :
(1) the number and quality of a person, including the number and quality of the management and production personnel;
(2) methods and tools, which include methods and tools for management and methods and tools for production.
In combination with the characteristics of the construction project, the factors include:
(1) the quantity and quality of the management personnel of the construction unit and all participating units (design, pr
您可能关注的文档
- 日语拨音(Japanese dial tone).doc
- 日语音标(Japanese phonetic symbol).doc
- 时差计算(The time difference calculation).doc
- 时空新理论——空子理论(The new theory of space-time -- the theory of space).doc
- 时评评论央视(Commentary CCTV).doc
- 日语学科(Japanese subjects).doc
- 时间管理——如何应对外界的干扰(Time management - how to deal with external distractions).doc
- 时间跳跃(Time to jump).doc
- 时间继电器(Time relay).doc
- 易经对于中华文化的影响(The influence of yi on Chinese culture).doc
- 管理1324(Management, 1324).doc
- 管理故事鲶鱼效应(Management story catfish effect).doc
- 管理统计学1-3(Management statistics 1-3).doc
- 管螺纹表示方法(The pipe thread representation method).doc
- 篮球技巧(Basketball skills).doc
- 粒子的建立(Establishment of particles).doc
- 管理软件(Management software).doc
- 粒子的波动性教学设计(The teaching design of the fluctuation of the particle).doc
- 粒子群算法的源代码(The source code of the particle swarm algorithm).doc
- 粤语音标(Cantonese is the phonetic symbol).doc
文档评论(0)