管理03(Management 03).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管理03(Management 03)

管理03(Management 03) Construction management organization of 2Z101020 I. the concept of system System depends on the observation of the objective things: an enterprise, a school, a research project or a construction project can be regard as a system, but the different systems of different goals, thus forming the organization concept, methods and organizational means also is not the same, the above all kinds of operation mode of the system is also different. The construction project as a system has its distinct characteristics compared to the general system, such as: (1) the construction project is a one-off; there are no two identical projects; (2) the whole life cycle of construction projects usually consists of decision-making stage, implementation stage and operation stage, each stage of the work tasks and work target is different, their unit is not the same, to participate in or involve long time its whole life cycle; (3) the task of a construction project is often composed of multiple, even many, many units to complete together, their relationship of the majority is not fixed, and some units involved in the interests of the different, even opposite. Therefore, the above characteristics should be fully considered when considering the organizational problems of a construction project or the organization design of project management. The relationship between the objectives of the system and the organization of the system The main factors that affect the realization of a system target are the following two (as shown in FIG. 2z101020-1) : (1) the number and quality of a person, including the number and quality of the management and production personnel; (2) methods and tools, which include methods and tools for management and methods and tools for production. In combination with the characteristics of the construction project, the factors include: (1) the quantity and quality of the management personnel of the construction unit and all participating units (design, pr

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档