2002年MBA联考数学试题(2002 MBA entrance examination maths test).docVIP

2002年MBA联考数学试题(2002 MBA entrance examination maths test).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2002年MBA联考数学试题(2002 MBA entrance examination maths test)

2002年MBA联考数学试题(2002 MBA entrance examination maths test) 2002 MBA entrance examination maths test -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- Published time: 2003-8-15 9:56:00 was read: 1834 times In 2002, she studied for the postgraduate entrance examination for master of business administration The answers to the questions must be answered on the answer sheet. The answers on the answer sheet are written on the answer sheet. The answers are invalid on the paper. One, the choice: There is only one right for each of the four choices given in each question Please put the options black on the answer sheet. 1. A number of bonus to a, b, c, d four people, 1/5 of them sent to armour, a third to b, c issued on the number of bonus is 3 times of the difference between the party a and b bonuses, known to ding prize is 200 yuan, the number of these bonuses is: A. 1500 yuan B. 2000 yuan C. 2500 yuan 2. The company has a staff of 50 people, theory examination scores for an average of 81 points, according to the result will be divided into two categories, the excellent and company worker, excellent worker an average score of 90 points, not a good worker is average score is 75 points, the number of people is not a good worker as follows: A. 30 b. 25 c. 20 d. cannot be determined 3. The companys a project completed by a, b two teams work six days, the company has to pay 8700 yuan, completed by b, c two team cooperation for 10 days, the company has to pay 9500 yuan, two teams: a, c 7.5 days to complete cooperation, the company has to pay 8250 yuan, if a separate contract for a construction team and ask for no more than 15 days to complete all the work, the company pay at least the team is: A. Team B. C. Team C. D. Cant be sure 4. A factory production of a batch of product after product insp

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档