托克托电厂10.25事故(10.25 accident at Togtoh power plant).docVIP

托克托电厂10.25事故(10.25 accident at Togtoh power plant).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
托克托电厂10.25事故(10.25 accident at Togtoh power plant)

托克托电厂10.25事故(10.25 accident at Togtoh power plant) Togtoh power plant 10.25 accident in October 25th 13:53, Inner Mongolia Datang Togtoh Power Generation Co. Ltd. (hereinafter referred to as Datang Tuoketuo Power) 3 sets of 600 thousand KW unit and switch off, load 1 million 630 thousand kilowatts, resulting in power grid frequency from 50.02 Hz to 49.84 Hz minimum. After the accident, the North China network timely launch accident emergency plan, transfer from the standby unit, the main frequency will be quickly returned to normal, did not cause the social power pull way. After a group of experts detailed investigation, it is found that the direct cause of the accident is the power plant maintenance personnel integrated water pump switch cabinet fault signal, the error will be connected to the negative DC AC power, DC control system caused by the mixed communication system and network, which led to the unit full stop accident. At present, the North China Power Grid Corp has issued a notification to the accident of the power companies within the network, requirements of the power generation companies earnestly learn lessons from the accident, to further strengthen safety management, strengthen the network factory coordination, to ensure the safe and stable operation of the North China power grid. A bulletin on the tripping accident of the 10.25 three unit of electric company 13:52 on October 25, 2005, Togtoh power company maintenance personnel in Tianjin occurred due to randomness, without expanding the scope of work, lack of risk analysis, mistakenly AC DC system access unit protection, major equipment accidents caused by 500kV in the operation of three units, two units all contact transformer tripping. We are pleased to inform you as follows: First, the accident before and after the operation The total active 1639MW, #1: 544MW #2; active repair; #3 machine stop; #4: 545MW; #5 active power: 550 MW; Tuoyuan line, Tuoyuan Tuoyuan line, second tier three operation; 50

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档