后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method).doc
- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method)
后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method)
Abstract: This paper summarizes the construction method of prestressed concrete box girder after tensioning method, and analyzes the problems encountered in the construction process.
Key words: post tensioning method, elongation, bellows, steel strand.
Foreword: This paper mainly takes the prestressed tensioning construction of the web beam and the floor beam of the bridge as an example to discuss the construction control of the post tensioning method.
Text:
First, the preparatory work before Zhang Zhang
1 bellows
A bellows arrangement when first reinforced processing ring frame as the positioning frame of the bellows, the vertical distance is 1m, the horizontal position according to the coordinates on the design drawings, the corrugated pipe is penetrated in the inner pipe, corrugated pipe to ensure the quality of the hole.
Two concrete should be checked before the bellows is provided with holes or deformed joints sealed with adhesive tape, and the joint in the anchor plate, must use tape or other things to plug, the waterproof corrugated pipe or mud into the anchor hole.
Three when building concrete, the vibrator shall be prevented from contacting the bellows directly so as to prevent leakage of grout.
2, steel strand
A steel strand is made of phi s15.2 (STM416-94a, 270, low relaxation) with a standard strength of Ryb=1860Mpa.
Two the steel strand should be laid on the clean and tidy surface, and the rust and sundries on the surface shall be removed.
Three wear beam before the steel strand will be straightened out, with tie wire binding, to prevent twisting in steel strands, the tensile stress is uneven, resulting in some steel strand is not up to the tension control stress while others may be pulled.
Four when crossing the beam, the single strand in the steel beam is numbered so that the corresponding number can be reached in tension, and the tension is symmetrical.
3 、 control
您可能关注的文档
- 为什么职场新人总在做错事(Why do new people always do something wrong).doc
- 为什么中国培训市场需企业要阳刚式的实战(Why does Chinese training market need enterprise to be manly practical).doc
- 为什么要当教师(Why do you want to be a teacher).doc
- 为什么要新课改(Why new curriculum reform).doc
- 为什么要标题呢(Why the headlines).doc
- 为何法国和意大利的奢侈品最多(Why are France and Italy the most expensive).doc
- 为什么需要绩效管理(Why performance management).doc
- 为你的品牌做体检(Do a medical examination for your brand).doc
- 为保护胎儿视力 孕妈少吃糖(In order to protect the fetus eyesight, pregnant mother less candy).doc
- 为员工提供福利连续性(Providing welfare continuity for employees).doc
- 2024年度强化训练人教版八年级生物上册第六单元 生物的多样性及其保护达标测试试卷(解析版含答案).docx
- 2024年度强化训练人教版八年级生物上册第五单元 生物圈中的其他生物定向攻克试题(详解版).docx
- 2024年度京改版八年级数学上册第十三章事件与可能性定向训练试卷(含答案详解).docx
- 2024年度强化训练人教版九年级化学上册第三单元 物质构成的奥秘定向练习试题(解析版).docx
- 2024年度人教版八年级数学上册第十三章轴对称同步练习试卷(附答案详解).docx
- 2024年度人教版八年级数学上册第十三章轴对称定向测试试卷(含答案详解版).docx
- 2024年度人教版九年级化学上册第四单元 自然界的水单元测试试卷(解析版).docx
- 2024年度强化训练苏科版九年级物理上册第十二章机械能和内能同步练习试题(含详解).docx
- 2024年度强化训练苏科版九年级物理上册第十四章欧姆定律必考点解析试题.docx
- 2024年北师大版七年级数学上册第二章有理数及其运算单元测试试题(解析版).docx
文档评论(0)