后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method).doc

后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method)

后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method) Abstract: This paper summarizes the construction method of prestressed concrete box girder after tensioning method, and analyzes the problems encountered in the construction process. Key words: post tensioning method, elongation, bellows, steel strand. Foreword: This paper mainly takes the prestressed tensioning construction of the web beam and the floor beam of the bridge as an example to discuss the construction control of the post tensioning method. Text: First, the preparatory work before Zhang Zhang 1 bellows A bellows arrangement when first reinforced processing ring frame as the positioning frame of the bellows, the vertical distance is 1m, the horizontal position according to the coordinates on the design drawings, the corrugated pipe is penetrated in the inner pipe, corrugated pipe to ensure the quality of the hole. Two concrete should be checked before the bellows is provided with holes or deformed joints sealed with adhesive tape, and the joint in the anchor plate, must use tape or other things to plug, the waterproof corrugated pipe or mud into the anchor hole. Three when building concrete, the vibrator shall be prevented from contacting the bellows directly so as to prevent leakage of grout. 2, steel strand A steel strand is made of phi s15.2 (STM416-94a, 270, low relaxation) with a standard strength of Ryb=1860Mpa. Two the steel strand should be laid on the clean and tidy surface, and the rust and sundries on the surface shall be removed. Three wear beam before the steel strand will be straightened out, with tie wire binding, to prevent twisting in steel strands, the tensile stress is uneven, resulting in some steel strand is not up to the tension control stress while others may be pulled. Four when crossing the beam, the single strand in the steel beam is numbered so that the corresponding number can be reached in tension, and the tension is symmetrical. 3 、 control

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档