二十四条教你工程定位和放线(The twenty-four will teach you engineering positioning and caving).docVIP

二十四条教你工程定位和放线(The twenty-four will teach you engineering positioning and caving).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
二十四条教你工程定位和放线(The twenty-four will teach you engineering positioning and caving)

二十四条教你工程定位和放线(The twenty-four will teach you engineering positioning and caving) The twenty-four will teach you engineering positioning and caving I. engineering positioning method: (1) after entering the field, the construction drawings shall be reviewed first to ensure that the design drawings are correct. Secondly, with the first party on the scene coordinates point and level points for acceptance, and found that the error is too large, should be discussed with Party A or design institute treatment methods, confirmed before the formal positioning. (2) setting up control coordinate network and leveling point. The method of setting up the plane control network is below. Level points are introduced by permanent leveling points, and protective measures shall be taken at the level to ensure that the level points are not destroyed. (3) after the location of the project, the construction unit and the planning department shall be allowed to receive the approval before the construction can be started. Two. According to the plane shape of the project, it is decided to adopt the square net control. According to the project positioning map, the vertical direction of the building is two axes, each 30m is measured with a control line, forming 30m * 30m field control network, the positioning of the building is based on the control network axis. Three. According to the plane shape of this project, it is suitable to adopt polygonal field control net. The three lines which are mutually equal to 120 degrees in the direction of the main axis of the project are used as the axis of the control network, and the distance between the control axes is 30m, forming a site control network. The location of the project is based on the axis. Four. Take the main axis of the vertical and horizontal direction of the project as the axis of the site control network, and form a site control network. Other axes of the project are determined according to the location of the main axis. Five during the e

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档