大工13春《水利工程概论》在线测试1答案(Big work 13 spring, Water Resources Engineering Introduction online test 1 answer).docVIP

大工13春《水利工程概论》在线测试1答案(Big work 13 spring, Water Resources Engineering Introduction online test 1 answer).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工13春《水利工程概论》在线测试1答案(Big work 13 spring, Water Resources Engineering Introduction online test 1 answer)

大工13春《水利工程概论》在线测试1答案(Big work 13 spring, Water Resources Engineering Introduction online test 1 answer) Great works, 13 spring, online introduction of hydraulic engineering, 1 Total score: 100 test time: - Judgment question Radio examination A multiple-choice question Judgment questions (a total of 15 questions, a total of 45 points) 1. roller compacted concrete gravity dam can be combined with thin layer large bin casting. A. error B. correct Full marks: 3 2. when the dam type used is not suitable for overflow from the dam or the valley is narrow, the spillway can be located outside the dam. A. error B. correct Full marks: 3 3. Xiluodu is the highest gravity dam built in China in recent years, the dam is 350 meters high. A. error B. correct Full marks: 3 4. when the pressure of a point in the dam flows to a saturated vapor pressure, the gas nucleus in the water body expands rapidly into a small cavity, called cavitation. A. error B. correct Full marks: 3 5. arch dam of Longyangxia the Yellow River hydropower station belongs to gravity arch dam. A. error B. correct Full marks: 3 The horizontal section of the 6. arch dam is composed of curved arches, with both ends supported on the bedrock of both banks. A. error B. correct Full marks: 3 7. the entrance of the approach channel shall be as far away from the outer anchorage as possible. A. error B. correct Full marks: 3 8. for arch dams, the weight is not a general load, and the design is in process of simultaneous or negligible seismic load. A. error B. correct Full marks: 3 9. the fluctuation of the water reduces the instantaneous load on the building and reduces the energy dissipation of the dam. A. error B. correct Full marks: 3 10. the first upper water diversion channel in ancient Rome was the aqueduct of maldives. A. error B. correct Full marks: 3 11.1950 years later, the arch dam is developed, in Switzerland built the worlds tallest Dick sens of arch dam. A. error B. correct Full marks: 3 12. in the world, more

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档