网站大量收购独家精品文档,联系QQ:2885784924

垃圾填埋场HDPE膜防渗施工方案(Construction plan of HDPE membrane seepage prevention for landfill).doc

垃圾填埋场HDPE膜防渗施工方案(Construction plan of HDPE membrane seepage prevention for landfill).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
垃圾填埋场HDPE膜防渗施工方案(Construction plan of HDPE membrane seepage prevention for landfill)

垃圾填埋场HDPE膜防渗施工方案(Construction plan of HDPE membrane seepage prevention for landfill) Construction plan of HDPE membrane seepage prevention for landfill The first chapter, the base surface requirements 1., before laying HDPE geomembrane, should be in conjunction with the civil engineering, establishment, design, owners of the laying of a comprehensive inspection of the base, in line with the design requirements, to meet the construction conditions, and handover inspection records before construction. 2. surface quality should meet the design requirements: the pit bottom, slope and slope ratio, slope, slope anchorage groove and righteousness surface junction, silo wall concrete structure surface should strictly meet the design requirements. 3., the base surface should be dry, compacted, smooth, no cracks, no obvious tip, no mud, no sag, vertical depth of 25mm, there should be roots, debris, stones, steel head, glass chip. The smoothness should be changed gently within the allowable range. The slope is uniform and the slope is uniform. 4., the base of the Yin and Yang corner of the smooth transition, the root of the column should be made arc shaped. 5. the base surface is dry and the moisture content should be below 15%. The 6. substrate should be dense and homogeneous, soil basal stem density of not less than 1.4t/ square meters. 7. in the civil construction, supervision, design units, owners, general contractor acceptance, signature and approval, they can carry out geomembrane construction. The second chapter, construction climate requirements 1., the temperature should generally be more than five degrees Celsius, low temperature, geomembrane should be more tense, high temperature geomembrane should be relaxed. 2. the wind is below four. 3., when the temperature is too low, more than 4 winds and rain and snow generally should not be built. 4. in the wind weather, wind affect the construction of geomembrane, HDPE geotechnical membrane bag application to be welded firm

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档