建筑流程(Building process).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑流程(Building process)

建筑流程(Building process) 1) first ready for construction enterprises to participate in the bidding of the full set of valid documents, and then choose their own projects to tender for registration. The tender side to all participating units after the study, obtain reference standard qualifications, pay a deposit to receive drawings, do the project budget. According to the requirements of the tender documents to determine the bid at the same time, in conjunction with the enterprise the Department determined to participate in the project construction management personnel (must have qualification certificates). Preparation of tenders, tenders submitted within the valid time set in the tender documents. Waiting for the opening. (during the best activity, to ensure that the bid to clear the relationship) 2) after the opening as the bid, to communicate with the project, the construction personnel sure, drawings, construction permit, license, notify the project for planning unit positioning line 3) of construction personnel and equipment into play, dig foundation - tank inspection -- Base - - - Acceptance of backfill Basic engineering finish 4) special subject construction -- hanging tree - - - the main completed acceptance after passing into the roof waterproof engineering and interior decoration plastering. On the plumbing, lighting system. The weaknesses of the system. Finally, doors and windows. Cross completed, clean health.5) test -- preliminary - project official notification after passing the acceptance, turnkey 6) do customer service service 7) to do the project accounts for payment (except outside - warranty gold) Bid: to obtain bid information - bidding registration - to receive bidding documents, construction drawings - bid - bid opening - winning bid Brick concrete structure construction process: foundation excavation and inspection of foundation subsoil foundation brickwork - ring beams, reinforced concrete, brick - based template - structure - a layer of brick

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档