- 8
- 0
- 约8.04千字
- 约 6页
- 2017-07-24 发布于河南
- 举报
建筑物变形观测(Building deformation observation)
建筑物变形观测(Building deformation observation)
Determination of the deformation of a building and its foundation under the load of the building itself or under the action of an external force for a certain period of time and its data analysis and processing. The contents include settlement, tilt, displacement, deflection, wind vibration and other deformation observation items. Its purpose is to monitor building during construction and after completion, put safety in use; geological survey data and verify the reliability of the design data; the reasons and rules of deformation, in order to improve the design theory and construction method.
The main contents of building foundation and foundation deformation observation are:
The rebound of foundation pit is measured before, during and after foundation pit excavation, and the observation points embedded on the base surface are measured, and the elevation changes caused by the excavation of the foundation pit are measured. The difference of elevation between two times before excavation and after excavation is the total rebound amount of foundation pit.
The settlement of the ground is measured and the elevation changes caused by the increase of load are measured at different observation points on the different soil layers, so as to obtain the settlement of each soil layer and the maximum depth of the compression layer.
Building subsidence survey measures the observation points on buildings or foundations, due to time lapse or elevation changes due to changes in foundation, and compares the observed values of different periods, i.e., settlement.
The above contents are deformation mainly with vertical displacement, the first method is according to the construction site topography, geological conditions and the precision of deformation monitoring, deformation control network reasonable layout (see control engineering measurement). In the building near the relatively stable position of laying work point, directly for the determina
您可能关注的文档
- 学生用卡西欧计算机用法(Students use CASIO computer).doc
- 学英语20条钻石法则(Learn English 20 diamond rules).doc
- 学生会个人工作计划范文_个人工作计划范文(The student individual work plan _ individual work plan.).doc
- 学期授课计划(Term plan).doc
- 学车知识(To learn the knowledge).doc
- 学英语20钻石法则(Learn English 20 diamond rules).doc
- 孩子学围棋的十个阶段(Children learn the ten stages of weiqi).doc
- 孵化基地1(Incubation base 1).doc
- 完全脱离鼠标(Completely detached from the mouse).doc
- 宅男约会注意(Otaku dating attention).doc
最近下载
- 【基恩士】LR-W500(C) 使用说明书 (简体中文).pdf VIP
- 2026年抖音达人内衣泳衣类目准入考试题库及答案.docx
- 2025年度民主生活会“五个带头”对照检查材料.docx VIP
- 人教版高中数学必修第二册第八章微专题3二面角的常见求法学案.docx VIP
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人考试备考题库附答案解析.docx VIP
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人备考考试题库及答案解析.docx VIP
- 2026年福建长泰国有投资集团有限公司及权属子公司招聘5人考试参考题库附答案解析.docx VIP
- 2026福建长泰国有投资集团有限公司及权属子公司正式员工招聘5人备考考试试题及答案解析.docx VIP
- 复合铜箔生产基地、薄膜金属化研发试验中心项目报告表.pdf VIP
- 小嘀人脸识别智能锁R5-产品说明书.pdf
原创力文档

文档评论(0)