- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机械加工时间定额(Time quota for machining)
机械加工时间定额(Time quota for machining)
Time quota for machining (Part I)
2008-4-30 14:44:00 [article font: large, medium and small] recommended collection print
Li Zhi machine network
Preface
1, reasonable time quota of parts processing is the correct data reflecting the cost of machining, the amount of labor and labor remuneration of workers.
2, the time quota of mechanical processing is the basic basis for the number of equipment and workers.
3, the mechanical processing time quota is reasonable or not, it objectively reflects the level of production technology.
4, the mechanical processing time quota, so that the basic elements of production technology management.
Machining time quota and its composition
1, what is the mechanical processing time quota?
It refers to the time required to complete the processing of a part or part of a piece of work.
2, the composition of the time quota:
(1) mobile time (also called basic time) (Tj) refers to the time needed to change the size, shape and surface quality of the workpiece directly. It includes tool approaching, cutting, cutting and cutting time.
(2) auxiliary time (Tf) - the time consumed by various auxiliary actions for processing each workpiece in a process. Includes questions about loading and unloading of workpieces and related steps. Such as starting and stopping machine tools, changing the amount of cutting, cutting tools, cutting, measuring and so on.
(3) the hours of work, rest, and physical needs (Tbx) - the time taken by the worker to clean up the work place during the working hours and to ensure that the work is normally done. Including reading transfer, check the workpiece, machine tools, grease and air to the machine tool, and the replacement of the grinding tool, fixture and cutting tools, ofchip cleaning work and work out before the return after the shift before wiping tools, machine tools, clean up the work site, the necessary rest and physiological needs when asked permission to fill the handover class rec
您可能关注的文档
- 新产品研发流程优化与研发项目管理201108(New product R & D process optimization and R & D project management 201108).doc
- 新乡公交线路(Xinxiang bus line).doc
- 新会计准则-速达财务软件新会计制度科目表(The new accounting standards, familiar with accounting software accounting subject table).doc
- 新会计准则下对谨慎性原则的思考(Reflections on the principle of prudence under the new accounting standards).doc
- 新 世界上最KB最诡异的童谣.它蕴涵了一个严密的逻辑推理!档(KB, the most bizarre nursery rhyme in the new world. It contains a rigorous logic of reasoning).doc
- 新会计准则与旧企业会计制度会计科目表 对照表(New accounting standards and old enterprise accounting system, accounting chart table).doc
- 整蛊邻居秘籍(Our neighbor.).doc
- 新入职员工工作总结范文(Summary of new employee's work).doc
- 新兰见证(Our witness).doc
- 新兴战略产业相关个股一览(Emerging strategic industries related stocks glance).doc
文档评论(0)