机电工程技术doc(Mechatronics engineering technology, doc).doc

机电工程技术doc(Mechatronics engineering technology, doc).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
机电工程技术doc(Mechatronics engineering technology, doc)

机电工程技术doc(Mechatronics engineering technology, doc) First, individual choice questions 1. equipment foundation elevation measurement, according to (B), with level measurement, after calculation, the equipment foundation of the actual mark on the basis of the appropriate location. Elevation of installed equipment near A Level point near B. Ground elevation near C. D measuring control network 2. in general, the elevation of the equipment foundation is determined according to (A). A relative elevation B. absolute elevation C. measuring control network D elevation of main equipment 3., in order to facilitate pipeline construction, pipeline elevation control survey, usually according to (B) measurements. A permanent elevation plate B. temporary elevation level C design elevation Elevation of equipment near D 4. when setting up the vertical and horizontal datum lines for installation of equipment, the following equipment installation needs to be embedded in the permanent sign board (C). A large precision equipment B. install multiple equipment in a workshop C. continuous production equipment D vibrating equipment 5. underground pipeline engineering measurement must be measured before Backfilling Pipeline stop, manhole and coordinates (C), according to the survey data compilation completion plan and profile. Location of the A line The trend of B. pipeline C. pipe top elevation Depth of D pipeline 6. boiler steel frame installation, usually use (C) its elevation control measurement. A. theodolite B. total station instrument C. level D. collimator 7. when setting up an instrument and measuring the elevation of several front views, use () A. height difference method B. instrument height method C. level D. collimator 8., the method of measuring distance accuracy is (C) A. level B. theodolite C back measurement D. collimator Analysis: after the whole measure back measurement distance, foot end to turn around, reading member exchange, according to the same method of back measure

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档