- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
脚手架安全防护使用措施(Scaffold, safety protection, application measures)
脚手架安全防护使用措施(Scaffold, safety protection, application measures)
Provisions for the use of scaffolding safety protection facilities (1)
Source: Date: 2010-06-18
Scaffolding is the construction site, the most widely used, the most frequent use of a temporary facilities. The most common are wooden scaffolding, bamboo scaffolding and steel scaffolding. There are several special types of scaffolding, such as scaffolding, mobile scaffolding, and suspension scaffolding. Each operator should have a certain understanding of scaffolding, and have a certain knowledge of the use and maintenance.
(I) general provisions on scaffolding;
(1) the scaffold shall be constructed by the workers who hold special work permit and shall be set up according to the approved construction plan and measures; and after the approval of the construction and use departments, the sign shall be put up before it can be used.
(2) at both ends of the scaffold, the supporting rod and the scissors support shall be provided at each 6-7 vertical poles. The angle between the supporting rod and the scissors and the ground shall not be greater than 60 degrees.
(3) the height of the scaffold above 7m and unable to set the supporting rod, the vertical horizontal every 4m, every 7m must be firmly connected with the buildings and structures; outer end of scaffold and the top and building orstructure with several strong connection point.
(4) around the outside, ramps on both sides, the scaffolding platform should block feet or set vertical safety nets set 1.05M high railing and 18cm; scaffolding must be set for operators on the vertical ladders and ramps, ramps should be non slip. Ceiling shall be provided at the top of the material, the platform and the passageway.
(5) scaffolding is strictly prohibited steel, wood, steel and bamboo mix and match; long-term unused scaffolding, wind, heavy rain and thaw period of scaffolding, before the resumption of use, must be checked, identified, qualified before re use.
(6) the
您可能关注的文档
- 杏花雨 丁香雾 六月雪 老长春三大美景(Apricot flowers, rain, cloves, fog, snow in June, old Changchun, three beautiful scenery).doc
- 老年痴呆病人的护理(Nursing care of senile dementia patients).doc
- 老手总结医疗营销宣传大法(Veteran summed up the medical marketing propaganda law).doc
- 老板为何不将人才摆在战略高位上(Why doesn't the boss put talent on strategic heights).doc
- 老板,请不要拖企业的后腿!(Boss, please don't drag the back of the business!).doc
- 老板讲历开服装店的经验(The boss talked about the experience of opening a clothing store).doc
- 老梁语录(Laoliang quotations).doc
- 老款桑塔纳机油灯控制原理(Control principle of oil lamp of old Santana).doc
- 老款车系(Old car system).doc
- 老花眼妙法!45---56岁间的男女值得关注(The presbyopia! 45---56 years old men and women worthy of attention).doc
- 中国残联直属单位2024年度第二批公开招聘应届高校毕业生笔试备考题库及参考答案详解1套.docx
- 中国残联直属单位2024年度第二批公开招聘应届高校毕业生笔试模拟试题及答案详解1套.docx
- 中国残联直属单位2024年度第一批面向社会公开招聘工作人员笔试模拟试题含答案详解.docx
- 山东省德州市夏津育中万隆中英文高级中学2024-2025学年第二学期高二6月地理试卷含答案.pdf
- 中国残联直属单位2024年度第二批公开招聘应届高校毕业生笔试模拟试题参考答案详解.docx
- 中国残联直属单位2024年度第二批公开招聘应届高校毕业生笔试备考题库附答案详解.docx
- 中国残联直属单位2024年度第一批面向社会公开招聘工作人员笔试模拟试题及参考答案详解一套.docx
- 中国残联直属单位2024年度第一批面向社会公开招聘工作人员笔试模拟试题及参考答案详解.docx
- 中国残联直属单位2024年度第一批面向社会公开招聘工作人员笔试模拟试题附答案详解.docx
- 中国残联直属单位2024年度第一批面向社会公开招聘工作人员笔试备考题库带答案详解.docx
文档评论(0)