混凝土冲孔灌注桩工作要点(Main points of concrete punching bored pile).docVIP

混凝土冲孔灌注桩工作要点(Main points of concrete punching bored pile).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土冲孔灌注桩工作要点(Main points of concrete punching bored pile)

混凝土冲孔灌注桩工作要点(Main points of concrete punching bored pile) Concrete punching bored pile work points.Txt, my life has A noodles, also has B noodles, your life has S noodles, also has B noodles. Failure is not terrible, the key is to see the success of his mother. Todays college students are too lacking in quality! Come over and get the wool and cut it! Have the time to learn Feng Shui, after the death of a good tomb, but also make up for the lifetime can not afford to buy a good room regret. The concrete work points of bored pile.Txt16 life, is a smile to face the reality, is watching over the obstacles in the future; life is to use the heart cut, cut out the green branches in the way of life; life is the face of confusion or darkness, the depths of the soul beans are bright and smiling lights. 17, the past and the future are far away from ourselves, the key is to seize the present and seize the present. This article is contributed by zhangjie8121 Xls documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Concrete (punching) filling pile, supervision work, concrete (punching) Stage serial number 1 construction preparation 23451 open 23 hole 4 Supervision work and requirements Familiar with design drawings, geological prospecting data and related specifications and procedures. Approve and familiar with construction organization design and all kinds of acceptance forms. Compile special supervision rules and master the working procedures and requirements. Site leveling, quality acceptance (site area, elevation, underground pipelines, etc.). Review and acceptance of survey control points (coordinate, standard, etc.). Construction units are required to provide written opening reports and measurement reports; to examine whether the reported materials are complete and to review and measure the situation on site. Check whether the hole has underground cables or other structures, and c

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档