混凝土塌彤(Concrete collapse).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土塌彤(Concrete collapse)

混凝土塌彤(Concrete collapse) 1.2, steel cage collapse hole in the sinking steel reinforcement skeleton will also produce hole wall collapse, the cause of the collapse may be reinforced cage transfer too hard or reinforced steel frame verticality is not good or cause bending. Therefore, in the reinforcement of the steel skeleton should be particularly careful, reinforcement cage transfer speed should be slow, the upper and lower two welding should be in the same axis position, and always observe the water level in the hole. Once the wall collapse, the water level in the hole will change. After the sinking of steel framework collapse, generally available for pouring concrete duct with sand pumped from the muddy waters of the mud, you should pay attention to the pump pressure can not be too large, so as not to aggravate the damage of drilling. 1.3 concrete pouring hole in concrete pouring process if found support level in the barrel of a sudden rise in mud and overflow tube, then drop and bubble phenomenon, it is estimated the collapse hole, available detector probe, if the surface depth measured by the detector is not up to the original depth is can be concluded that the occurrence of hole collapse. The hole collapse reason may be Water Leakage around the tube bottom hole, the water level dropped or the river water level rose, pore water level difference decreases, can not maintain the original hydrostatic pressure, and the casing around the pile loads or mechanical vibration etc.. Once the collapse hole, should immediately identify the causes and take appropriate measures, such as to maintain or increase the head, remove and eliminate the heavy vibration. Then the suction machine suction hole in the slump mud mud, hole collapse if the stop, you can continue to pour concrete, if it continues to collapse, and hole collapse at the site of the deep. We should pull the guide tube, the concrete drill out, and reinforced cage, and clay mixed with gravel backfill. The heavy back

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档