- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土开盘鉴定(Concrete opening appraisal)
混凝土开盘鉴定(Concrete opening appraisal)
Concrete opening appraisal
A set of commercial concrete mixing station by providing, you only need to provide: inspection, inspection lot, construction record, pouring application, slump measurement. 28 after mixing station also provide test block report.
Field mixing: provide their own: inspection, construction records, raw materials and mix proportion and construction inspection lot, appraising and pouring application, slump measurement.
Provision for casting before concrete opening.
After the concrete pouring of concrete inspection:
In accordance with the code for acceptance of construction quality of concrete structures, GB50204-2002 stipulates that the proportion of concrete used for the first time shall be evaluated by opening. In actual production, the proportion of concrete used for the first time shall be evaluated by opening, and at least one group of 28d standard specimens shall be retained to verify the consistency between the actual quality of concrete and the design requirements. Construction units should pay attention to the accumulation of relevant information, in order to improve the design level of mixing ratio, the content of concrete opening appraisal is as follows:
Identification of concrete opening shall be carried out by the construction unit, organization supervision (construction) unit in concrete mixing units and on-site agitation, which shall be carried out by the construction unit, organization supervision (construction) unit. Participants are the project technical supervisor of the construction unit, the supervision engineer of the supervision unit, the project technical leader of the construction unit and the quality inspection department of the concrete mixing unit. Opening appraisal final results shall be signed by the participating personnel representative units.
The following information should be provided for opening appraisal:
1) application form or supply requisition for concrete mix;
2) the de
您可能关注的文档
- 校园周边环境大调查(Campus environment survey).doc
- 校园卫生调查和防治(Campus health investigation and Prevention).doc
- 校园导游系统(Campus tour guide system).doc
- 校园文明用语集锦(A collection of campus civilization expressions).doc
- 校园文化浅析(Analysis of campus culture).doc
- 校园文明礼仪歌谣(Campus civilization etiquette ballad).doc
- 校园网建设规划(Campus network construction planning).doc
- 校园营销活动策划书(Campus marketing activity planning book).doc
- 校外辅导员活动记录(Off campus counselor activity record).doc
- 校庆活动内容(Anniversary activities).doc
- 混凝土强度保证率(Concrete strength assurance ratio).doc
- 混凝土强度的影响因素(Influential factors of concrete strength).doc
- 混凝土指标(Concrete index).doc
- 混凝土强度等级(Concrete strength grade).doc
- 混凝土搅拌车运输车工作原理(Working principle of concrete mixer truck).doc
- 混凝土留样(Concrete retention).doc
- 混凝土的问题(Concrete problems).doc
- 混凝土冬季施工技术(Construction technology of concrete in winter).doc
- 混凝土结构专升本资料10 试题及答案(Concrete structure, upgraded materials, 10 questions and answers).doc
- 混凝土结构思考题(Thinking of concrete structure).doc
原创力文档


文档评论(0)