- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土后浇带(Concrete back pouring band)
混凝土后浇带(Concrete back pouring band)
[reply] [search] [] [] third flowers affixed to the top floor of 2008-5-9 12:27:00
After construction, the pouring zone is divided into the post pouring settlement zone, the post pouring shrinkage band and the post pouring temperature zone, which are used to solve the differential settlement of the high-rise building and the lower skirt room, the shrinkage deformation of reinforced concrete and the temperature stress. This kind of back pouring belt has the function of many kinds of deformation joints, and the design should take the function of one kind as the main and other functions as the auxiliary. The construction of the pouring belt is the whole building, including the foundation and L: part of the structure in construction cracks (seam is very wide, it is known as the belt), to be completed the main structure, after pouring concrete filled after the seam that does not exist, not only in the whole construction to solve the high-rise the main building and the podium in low differential settlement, and achieve the purpose without permanent deformation joint.
Usually in the design, we are writing practice in the structural design of general description, are as follows: after pouring was mixed with expansive concrete agent, water curing concrete limit expansion rate is greater than or equal to 14 days increased 20% in the pouring of beam and slab reinforcement across 0.015%. after pouring belt should be the main structure completed the expansion of concrete pouring for 60 days and then stable settlement than the adjacent concrete strength of a high level of.
In high-rise buildings, due to the need of function and form, often the high-rise building and the podium low rise together, most of the main building surrounded the podium. From the traditional view of the structure, to high-rise building and podium disengaged, which requires setting deformation joint; but the construction requirements and dont want to see a joint. Because th
您可能关注的文档
- 校内API Methods文档[feed分册](API Methods documents on campus [feed fascicle]).doc
- 栈板标准尺寸(Standard pallet size).doc
- 校名产品(Product name).doc
- 校园剧本(Campus script).doc
- 校园一卡通使用指南(Campus card guide).doc
- 校园周边环境大调查(Campus environment survey).doc
- 校园卫生调查和防治(Campus health investigation and Prevention).doc
- 校园导游系统(Campus tour guide system).doc
- 校园文明用语集锦(A collection of campus civilization expressions).doc
- 校园文化浅析(Analysis of campus culture).doc
- 混凝土在现代建筑施工中的应用分析编辑(Analysis and application of concrete in modern building construction).doc
- 混凝土塌彤(Concrete collapse).doc
- 混凝土外加剂减水率的快速测定方法(Rapid determination method of water reducing rate of concrete admixture).doc
- 混凝土处理(Concrete treatment).doc
- 混凝土复习内容(Concrete review content).doc
- 混凝土外加剂(Concrete admixture).doc
- 混凝土实验室仪器清单(Concrete laboratory instrument list).doc
- 混凝土工程交底(Concrete engineering disclosure).doc
- 混凝土开盘鉴定(Concrete opening appraisal).doc
- 混凝土强度保证率(Concrete strength assurance ratio).doc
原创力文档


文档评论(0)