- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砖砌雨、污水检查井施工工艺(Construction technology of brick rain and sewage inspection well)
砖砌雨、污水检查井施工工艺(Construction technology of brick rain and sewage inspection well)
Construction technology of brick rain and sewage inspection well
1, scope of application
The ground bearing capacity is better, and the rain water and sewage pipes with lower groundwater level are used
2 、 construction preparation
2, 1 material requirements
1, cement, sand, brick, admixture and water after passing the test, the number should meet the construction needs, quality to meet the requirements of mortar mixing system.
2, brick, mortar and cover concrete compressive strength should comply with the design requirements.
3 、 the selection of well ring, well cover and step is in line with the design requirements.
2, 2 construction machinery and equipment, mortar mixing equipment, quantity, capacity, should meet the needs of on-site mixing.
2 and 3 working conditions
1, the drainage pipeline inspection well foundation strength should meet the design requirements, surface cleaning clean and tidy.
2. Locate the axis of the location and indicate the elevation of the bottom hole (elevation of the water level).
3. The materials used have been transported to the construction site to meet the construction requirements.
4, construction mortar mixture ratio has been completed and meet the construction needs.
5, Imuro Mauchimi put through the spare branch pipe mouth has been blocked.
2, 4 technical preparation
1, drawings (standard atlas)
Review has been completed and the design details.
2, construction personnel obtained technical clarification and safety disclosure, clear construction site, mortar, etc. quality requirements.
3, operation process
3 and 1 process flow:
The bottom base, masonry well chamber and well flow, surface finishing and application of mortar compaction chamber and closing well wall jointing, installation steps, reserved pipe installation and borehole wall cohesion treatment, well received two high, the height of pouring or installation, the well ring covers in place.
3, 2
您可能关注的文档
- 浇注型聚氨酯弹性体胶辊的加工工艺(Processing technology of casting polyurethane elastomer roll).doc
- 济南导游词(Ji'nan guide words).doc
- 测绘工作计划(Mapping work plan).doc
- 济南市城市二次供水管理办法(Measures for the administration of the two water supply in Ji'nan City).doc
- 洗浴员工管理制度(Bath staff management system).doc
- 济南情调餐厅地图(Ji'nan restaurant map).doc
- 洼地效应的实与虚(The reality and deficiency of depression effect).doc
- 浆砌石(Masonry).doc
- 济南西门子热水器维修清洗-保养服务(Maintenance and cleaning service of Ji'nan SIEMENS water heater).doc
- 济南软膜天花济南创易彩饰软膜厂家(Ji'nan Ji'nan Chuangyi decoration piamater piamater ceiling factory).doc
- 砖砌体裂缝原因及其防治(Causes and prevention of brick masonry cracks).doc
- 硬盘RADE技术详解(Detailed explanation of hard disk RADE Technology).doc
- 硬盘划分(Hard disk partition).doc
- 硬盘分区及大小调整(Hard disk partition and size adjustment).doc
- 硬度 刚度(Rigidity).doc
- 硬盘型号性能速查手册大全(The hard disk model performance Handbook Daquan).doc
- 硬盘常规维护(Hard disk routine maintenance).doc
- 矩阵世界——机器文明腾飞的摇篮(Matrix world -- cradle of machine civilization).doc
- 硬盘标称容量和实际容量(Nominal capacity and actual capacity of hard disk).doc
- 硬盘电路板维修故障分析与处理步骤(Failure analysis and processing steps of hard disk circuit board maintenance).doc
原创力文档


文档评论(0)