5kV飞蛾亭至六祖至里洞线路改造工程可研、勘察设计(5kV moth pavilion to the reconstruction project of the liuzuo - li hole line reconstruction project).docVIP

5kV飞蛾亭至六祖至里洞线路改造工程可研、勘察设计(5kV moth pavilion to the reconstruction project of the liuzuo - li hole line reconstruction project).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
5kV飞蛾亭至六祖至里洞线路改造工程可研、勘察设计(5kV moth pavilion to the reconstruction project of the liuzuo - li hole line reconstruction project)

5kV飞蛾亭至六祖至里洞线路改造工程可研、勘察设计(5kV moth pavilion to the reconstruction project of the liuzuo - li hole line reconstruction project) The 335kv moth pavilion to the redevelopment project of the liuzu-li tunnel was designed for the exploration and exploration Pre-qualification documents for the applicants qualifications Tendering unit: guangdong power grid company yunfu power station Bidding agency: guangzhou xi da electric power technology consulting co. LTD March 2002 I. project overview: 1. Project name: 35kV moth pavilion to liuzu to lidong line reconstruction project, feasibility study, investigation and design 2. Project scale: xinxing county has transformed the moth-booth to the sixth ancestor, the six ancestral to the li cave 35kV line, the length of the line is 25km, and the wire section is 150mm2. 3. Scope of bid: prepare the feasibility study report of the project. According to the feasibility review opinion issued by guangdong power grid company, the preliminary design of the project (including the budget estimate) and the construction drawing design (including budgeting) shall be prepared, and the completed drawings shall be prepared. Prepare the project approval application report. 4. Project address: yunfu city Ii. Documents of prequalification documents shall be submitted in the following order and format (the reasons for the lack of items shall be explained) : 1. Cover (in annex 1 format); 2. Application for pre-qualification (in annex 2 format); 3. Certificate of legal representative (in the form of attachment 3) and power of attorney of legal person (in the form of attachment 4); 4. Copy of the business license and a copy of the qualification certificate of the enterprise (the original shall be checked); 5. Company performance: 5.1 in 2009 and 2011, the company shall be able to undertake the research and design performance of 35 kv and above similar projects (in the form of annex 5); 5.2 2009-2011, the company shall be responsible for the production of 35

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档