地铁隧洞下穿高层建筑施工技术(Under the subway tunnel, the construction techniques of high-rise buildings are worn).doc

地铁隧洞下穿高层建筑施工技术(Under the subway tunnel, the construction techniques of high-rise buildings are worn).doc

  1. 1、本文档共19页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁隧洞下穿高层建筑施工技术(Under the subway tunnel, the construction techniques of high-rise buildings are worn)

地铁隧洞下穿高层建筑施工技术(Under the subway tunnel, the construction techniques of high-rise buildings are worn) Subway tunnels wear high-rise construction techniques Zhong Huimin The sixth branch of China railway 16th bureau Abstract with the rapid development of urban rail transit and real estate industry in China, more and more adjacent buildings will be built around the rail transit line. While developing rail transit, the effects of interval tunnels on adjacent buildings and other foundations are inevitable. Sometimes tunnels are not just adjacent buildings but directly under buildings, which will have a great impact on the construction of the tunnel and the normal use of buildings. Therefore, in order to minimize the impact on buildings, it is necessary to study and analyze how to reduce the impact of tunnel excavation on buildings. Based on the analysis and research of the actual construction of the tunnel of the two well - jinsong interval which has been passed from the yong3 to the 16th floor, there is some reference and guidance for similar engineering construction. Key words: subway tunnel high-rise buildings, shallow underground excavation monitoring measure difference settlement CD/CRD method 1 project overview Double JingZhan ~ between hill station, is located in chaoyang district of Beijing, the design starting point line range of K23 + 287.189, end mileage of K24 + 095.68, line length of 808.638 m, as a standard single interval, the interval was completed in 2006 on September 23. The interval along the direction of the third ring road is located, and the building is dense on both sides of the line, which has a certain effect on the tunnel construction. Which ever and 3rd floor (along south road no. 42) and wing (along south road no. 44) on 16th floor of this range, buildings in line mileage K23 + 426 ~ K23 + 355 section, right line structure of skin and building recently, horizontal distance to 9 m, (the right line in not under the condition of pile spacing, on

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档