紫阳汉江特大桥深水桩基础混凝土灌注施工(Construction of foundation concrete in deep water pile in ziyang hanjiang bridge).docVIP
- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
紫阳汉江特大桥深水桩基础混凝土灌注施工(Construction of foundation concrete in deep water pile in ziyang hanjiang bridge)
紫阳汉江特大桥深水桩基础混凝土灌注施工(Construction of foundation concrete in deep water pile in ziyang hanjiang bridge)
There are too many TXT swindlers, and the fool is clearly not enough. I was on the road to kill the dragon swim river crossing the river to climb the top of the tower to kiss your princess. This article is contributed by hezhongyihao
PDF documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view.
98?
Vol. No.36 Vol. No.36, Vol. No.36, 2009 Dec., 2009 Dec
Article no. : 100926825 (2009) 3620098202
Construction of foundation concrete in deep water pile in ziyang hanjiang bridge
Wu tao from ding hai Ming
Pick: to ziyang hanjiang river bridge on deepwater pile foundation concrete pouring construction process are analyzed, and introduces in detail the construction process of the important control procedures, in deepwater pile foundation concrete construction technology should be improved and the accumulation of deep water pile foundation of the large bridge of concrete construction experience. Key words: oversize bridge, deep water pile foundation, concrete, inpouring middle map classification number: U443. 1 literature identification code: A pump for mud circulation; Drilling in the drilling slag by circulating suspension, hole mud pumps to drilling platform, through the mud separator, liners, the mud into the mud again through the mud pump pumping cycle to the bit at the bottom of the bore. In the meantime, a mud boat is set up in the water, which is responsible for the cleaning and transportation of the dregs, which are transported by the carrier to the designated position. The head height of the drill bit is adjusted by the mud pump, and the water level of the inside and outside of the tank can be monitored at any time. The height of the water head in the cylinder is 1. 5 m ~ 2.0 m.
Ziyang hanjiang river is the well-being - shan chuan side of the large bridge on the highway engine
您可能关注的文档
- 病理学习题(Pathologic problem).doc
- 病理学历年真题总结记忆(The history of pathology is a summation of memories).doc
- 病理学名解(Pathologic name solution).doc
- 病理基础知识150问(The pathology basic knowledge 150 ask).doc
- 病理学和病理生理学自测试题(Pathology and pathophysiology test).doc
- 病理学简答(Pathologic simple answer).doc
- 病理学考试必考内容0101(The pathology exam will have an examination of 0101).doc
- 病理学试题二(Pathology exam 2).doc
- 病理学题库(Pathology library).doc
- 病理学理论教学大纲-7年制2011(Pathology theory syllabus - 7 year 2011).doc
最近下载
- 华为培训教材存储产品概论.ppt
- Q31 0115000140C043_立邦反射隔热涂料.pdf VIP
- 首届智能用电运营工技能竞赛理论考试题库-下(多选、判断题汇总).docx VIP
- 《输配电及用电工程》理论考试题库-下(多选、判断题汇总).docx VIP
- 《经皮去肾交感神经术治疗高血压专家建议2025》解读.pptx VIP
- 公立医院经济管理年活动自评报告三.docx VIP
- 关于深入推进移风易俗工作的通知.doc VIP
- 普通高中通用技术学生设计作品图文材料.pdf VIP
- 2024年《输配电及用电工程》理论考试题库(浓缩400题).docx VIP
- 考研英语2005年-2018年英语二答案.docx VIP
文档评论(0)