2010年咨询师《宏观经济政策与发展规划》考前练习题(In 2010, consultant, macroeconomic policy and development plan test exercises).docVIP

2010年咨询师《宏观经济政策与发展规划》考前练习题(In 2010, consultant, macroeconomic policy and development plan test exercises).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2010年咨询师《宏观经济政策与发展规划》考前练习题(In 2010, consultant, macroeconomic policy and development plan test exercises)

2010年咨询师《宏观经济政策与发展规划》考前练习题(In 2010, consultant, macroeconomic policy and development plan test exercises) In 2010, consultant, macroeconomic policy and development plan test exercises 1, in the implementation phase of the project, the main work of the owners is as stipulated in the contract for the smooth implementation of the project to provide the necessary conditions, and in the implementation process of supervision and inspection and coordination of the work of the parties, on a regular basis of the progress of the project. The following are the main tasks for the owners not in the project implementation phase. A. lose the project approval process required by the owner B. organize or entrust the supervision engineer to review the design of the construction organization C. provide the contractor with the data of engineering geology and underground pipelines, ensuring the authenticity of the data D. good reception and management of relevant information about the project 2, the following does not belong to the consulting engineer in the project implementation phase of the main work is (). A. carry out the project intermediate evaluation according to the owners entrustment B. timely report to the owner on the progress, quality and cost of the project C. carry out post evaluation of the project D. prepares personnel for training, operation, piling up and establishment of rules and regulations for the operation after the project is put into operation 3. Does not belong to the contractor for the purpose of project management is (). A. guarantees that the contracted project or equipment is up to date in terms of schedule and quality B. to improve the overall quality of their team, to enhance their reputation in the industry C. pursues the maximization of its own income, and the Contractor shall be entitled to the corresponding remuneration after completion of the work of the commissioning contract and the requirements stipulated in the contract The basic purpose of D. i

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档