- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
e水电木瓦油(E water bakelite tile oil)
e水电木瓦油(E water bakelite tile oil)
I. waterway
(I) waterway reconstruction
1, material: PPR pipe and pipe fittings
2, advantages:
(1) corrosion resistance, PPR is non-polar polymer, chemical inertness is good, to the ions in water and chemical substances in the building can not play any chemical action, no rust, no corrosion
(2) good hydraulic performance, smooth inner wall, low noise of conveying water, small resistance, higher flow rate than galvanized pipe 30%, no scaling, no bacteria
(3) good temperature resistance, long service life, long-term use temperature of 70 degrees, up to 95 degrees, at 70 degrees temperature, pressure 1.0MPA, life expectancy of up to 50 years.
(4) the heat preservation and thermal conductivity are only 0.2W/m.k, and the thermal conductivity is only 1/200 of the metal tube.
3, process flow:
Crossed slot hole positioning - - - acceptance - cement mortar pipe seal
4, matters needing attention:
(1) waterway construction, according to the actual situation of kitchen and toilet and customer demand, reasonably determine the various water points, such as: location and pipeline valve, faucet, shower, angle valve path crossed position.
(2) buried pipeline, Zaoqiang geosyncline should ensure depth of buried pipeline in metope, ground powder after repair should not be exposed, should avoid digging trench level, prevent the destruction of building structure.
(3) PP-R pipe installation layout is reasonable, horizontal and vertical, the pipeline shall not be near the power supply, and the shortest distance between the power line is 200mm, the pipeline and sanitary appliances are closely connected.
(4) water pressure test is completed, must use cement mortar filling.
(5) when reforming the waterway, attention shall be paid to the orientation of the pipeline and the requirements of the location, height and dimension of the reserved interface and angle valve.
The installation height of the water supply pipe of the toilet is generally 250mm from the groun
您可能关注的文档
- 08机制专业机电企业管理导论名词解释(08 mechanism professional mechanical and electrical enterprises management introduction, terminology explanation).doc
- 08白酒市场的甲方乙方(08 Party A Party B of liquor market).doc
- 08质量专业基础知识与实务(初级(08 basic knowledge and practice of quality specialty (junior level)).doc
- 09失误(09 turnovers).doc
- 09复习(09 review).doc
- 09年前数据(Data 09 years ago).doc
- 09年二级建造师水利水电管理与实务练习题汇总(09 year two construction division, water and hydropower management and practice exercises summary).doc
- 09年央视春晚主持词(CCTV Spring Festival Gala 09).doc
- 09年实物(09 years in kind).doc
- 09年所有新番动漫+ova+ ovd+剧场版(09 years all new animation +ova+ ovd+ theatre version).doc
- e词根词缀总结----(E root affixes summary ----).doc
- fanuc16180i通用故障分析(Fanuc16180i general fault analysis).doc
- fat32文件长文件名(FAT32 file long filenames).doc
- fc-757at全自动高频天线调谐器(Fc-757at full automatic high frequency antenna tuner).doc
- ffmpeg configure 参数翻译(ffmpeg configure 参数翻译).doc
- ffxi 国家任务攻略(FFXI national missions).doc
- flash键盘钢琴谱(flash键盘钢琴谱).doc
- flac常用命令(FLAC common commands).doc
- fluent中非稳态算例计算置疑(Calculation of unsteady state in fluent).doc
- fob报价计算方法及变换规律(Calculation method and transformation rule of FOB quotation).doc
文档评论(0)